building steel Hex nut casted/formwork tie rod nut

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

color:
galvanized or self color

Packaging & Delivery

Packaging Detail:Crates,or Pallets, or Big bags,or Customed following customer
Delivery Detail:20days

Specifications

1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron

1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron  

5.Supply Ability: 50000 sets per month

6.Custom Made: Available

Our main products involve the Wing Nut, Formwork Clamp,  Nut, Base Jack Nut,   Slope Plate, Walter Plate, Pressed Plate,  Tie Rod, Scaffolding Coupler, Round Coupler, Pins, Washers, Steel Cone, Iron Cone, Concrete parts, Lock Nut, Flanged Wing Nut, Anchors, Lifting Anchors, Sockets, Lifting Clutch, Recess Former and other casted and pressed Formwork Accessories, Scaffolding Accessories etc.

   Our selling network spread all over the world, the current main customers come from the Europe, the Middle East, the America and the Africa.

1. We are one of the biggest factory on formwork and scaffolding accessories

2. We have more than 10 years experience on manufacturing and exporting.

3. We have the advanced equipment and process flow and excellent quality control.

4. We have the competitive price.

5. We have the completed sales and service team so that we can offer the best service



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:how long should i wait to change my scaffolding piercing?
well it depends because some bars are thicker than others, if your changing to a bar as thick as the one you have now then i say about a month is good but if its the slightest bit thicker i suggest you wait maybe 2 months and in the mean time make sure your turning it and wiggling it so after the 2 months go by you can change it to a thicker bar without it hurting
Q:Advice to anyone thinking about getting an industrial/scaffold piercing?
Most piercings need 6 months to fully heal. Industrial will take up to a year to do so. You have to keep the jewelry in and do not take it out ( not even once ) for the whole period of 1 year. This means that you can't hide it for school. You can't put a retainer on also, cause only titanium or stainless steel material are proper for an open wound aka a new piercing. This piercing is not easy to heal and can stay irritated for long. It goes through cartilage and you have to be really careful with the aftercare and the piercer's info if you want to keep the piercing and yourself healthy. You have to be careful and not touch it or play with it and twist it or take it out. You clean this piercing with sea salt soaks or non alcohol antibacterial soap 2-3 times a day. You dry it with paper towels. If you can do the above daily and be extra careful go get it done. Gluck
Q:Scarlet Letter: Why does Hester keep her promise to Chillingworth on the scaffold?
Because she owes him since she cheated on him.
Q:Fastener type steel pipe scaffold composed of which components?
3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.
Q:What's an antonym for the word scaffold?
Since a scaffold is a bridge/ladder/support used to allow you to span the gap between you and and object you wish to reach, I'd go with barrier.
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:Can you do the outer scaffolding?
(2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range