Scaffolding Ringlock ledger /cross brace

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 m.t.
Supply Capability:
10000 m.t./month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ring Lock Scaffolding

1)Main material: Q345
2)Surface: Hot dip galvanized
3)size: 48.3mmX3.25mm

4)welding: automatic welding technology

5)Certification: ANSI/SSFI SC100-5/05

Vertical:1m,1.5m,2m,3m
Ledger: 732,1088,1400,2072,2572,3072mm

Components: Standard, Ledger, Brace, Plank, Ladder, Base jack, Rosette, Start collar











With automatic welding technology ,stable quality ,uniform and smooth surface .



Rizhao Fast and Fasten Scaffold Co., Ltd. is a professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.






Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.




Packing

Woven bag and pallet , carton, plywood case, as your request.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:Latch type disc scaffolding accessories is a national patent product
Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Q:Erection of scaffolding accessories
Scaffolding is the door frame, a cross support, connecting rods, hanging button scaffold or horizontal frame, etc. the basic structure of the lock arm, and then set the horizontal reinforcing bar, scissors, sweeping rod, sealing rod, bracket and the base, and the use of a standard wall connecting piece is connected with the main structure of the building standard steel pipe scaffold. Steel pipe scaffold can not only be used as an external scaffold, but also can be used as scaffolding or full scaffolding.
Q:Getting my scaffold (industrial piercing) done tomorrow. Tips?
I got my industrial two days ago and it was my first piercing besides the standard lobes and i heard it hurt the worst of all the ear piercings and u have 11? Lol if I could do it u can do it lol I was soooooo nervous and then it just happened and not gonna lie it hurt a lot lol but what I did to distract myself I just talked really loud about the pain lol I was like O MY GOD IT HURTS SO BAD lmao and now it's a lil sore but ull be happy with the results :D
Q:What are the characteristics of Pankou scaffolding
Pankou scaffolding, unique technology of hot dip galvanizing, hot-dip galvanizing is a strong adhesion, used for a long time, a uniform film coating.
Q:Scaffolding scaffolding erection norms which requirements, who can say?
This problem is more professional, we must be more professional people to answer, just do this industry, here on the simple about the content, you can refer to see.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
Because those guys are not talented at all and cause a lot of trouble for WWE and all the big names televised.
Q:how do i get rid of the lumps on my ear because of my scaffolding?
A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range