• Scaffolding ringlock ledger heads/end System 1
  • Scaffolding ringlock ledger heads/end System 2
Scaffolding ringlock ledger heads/end

Scaffolding ringlock ledger heads/end

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:
scaffolding ledger end
Type:
Scaffolding system
Material:
Q235, Q345 carbon steel
color:
self-colored, silver, yellow,green or as your requirement
Surface:
HDG,pre-galvanized,painted
Thickness:
3.0/3.2mm
Diameter:
48.3mm
Standard:
EN74,BS1139,SGS,CE ,ISO 9001:2008
Scaffolding system:
scaffolding ledger end
Stable:
durable
dismantle:
Easy to assemble

Packaging & Delivery

Packaging Detail:in pallet or in bundle. according to the length you needed to combine the container
Delivery Detail:no more 20days

Specifications

best price and good quality .
good bearing capacity .
Used time long .
very good stability .
covenient to transport

Kwikstage system

1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle

Our capability

Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch   press,3sets 300t punch press

Produce Technology: stamping/pressing/forging;

Produce Capacity: 500 tons/month

Output: 3000 pcs/day couplers,3000pcs steel plank

Specification

1.Standard:

  size:48.3*4mm thickness steel tube  Length(mm):500/1000/1500/2000/2500/3000/3500/4000

2.Ledger:

  size:48.3*3.25mm thickness steel tube   Length(mm):1200/1800/2400

3.Transom:

 50mm*50mm*5mm thickness steel angle Length(mm):600/800/1200/1800

4.Brace(diagonal)

  size:48.3*2.5mm thickness steel tube Length(mm): 1830/2750/3530/3660

5.Bace Jack:

   Solid Bace Jack:34mm(diameter)*650mm(length)or as your request

   Hollow Bace Jack: 38mm(diameter)*4/4.5/5mm(thickness) or as your request


Q: i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q: Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
Q: What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: I'm trying to understand a problem in my physics book. The problem is this:A person is pulling on a rope, that is connected to a pulley on the ceiling. The rope then goes to a box with a pulley on it, and then up to the ceiling where the rope is connected (to the ceiling).The rope and pulleys are massless and frictionless.The book lists three forces (tension forces) going up and one weight force pulling down.My question is, why isn't there another force pulling against the tension of the rope from the guy pulling the rope?
well, the person is going to have to pull on the rope, and that will be another force that is not pictured in the book. if you think about it, when a rope is under tension, each end is getting pulled, like a tug of war, otherwise it just moves toward the other force. When the forces are balanced, the rope is in tension and does not move. The forces pictured in the book are tension provided by the weight. The person will have to add a tension force downward to compensate.
Q: How to maintain the scaffold after use
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q: i just need to know the age limit with parental permission?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q: Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q: What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords