• Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System System 1
  • Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System System 2
  • Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System System 3
Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System


Use: 

Ledgers are the horizontal members of ringlock scaffolding, they provide horizontal support for loads and planks. Ledgers can also be used as mid rail and top or hand guard rails


Product description:

1.suitable for buildings like bridges, tunnels, large-scale construction projects, water conservancy project ,ship buildings, and so on.

2.latest wedge lock system is easy assembly and time saving. Due to its high stability and bearing capacity ringlock scaffolding is popular in the world.

3.made by high-strength welded pipe (48X3.0-3.5mm),which is durable and ensures the workers'  safety.


Surface finishing: 

Hot Dipped Galvanized ( HDG)


Specification:

LengthWeightMaterial
732mm3.25kgQ235

1088mm

4.55kgQ235
1400mm5.67kgQ235
1572mm6.29kgQ235
2072mm8.20kgQ235
2572mm9.90kgQ235
3072mm11.71kgQ235

Others Accessories:

Ledger, Standard( Vertical), Base Collar,  Steel Plank, Screw Jack etc. (Click to quick view).



Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q235 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System




Q: What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q: - Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
In the late 1950s, oil wells were specially developed for oil
Q: A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q: How to do a good job in typhoon prevention work in rural areas?
Close the doors and windows, so as not to be strong wind blowing, check and tightly easy to be the wind to the objects, such as windows
Q: Seeking construction machinery safety supervision papers can be greater than 100 words
Summary: With the national construction laws and regulations, the introduction of local laws and regulations, the construction of administrative departments in charge of supervision and supervision of the implementation of the project construction quality has improved significantly, but not with the Adapted to the safety management of the construction process has not been able to work with the quality of construction work to improve, vicious security incidents frequently
Q: On the issue of compensation after the event of force majeure
The cleaning and repair costs of the works do not include scaffolding
Q: Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: How to do a good job of typhoon during the mass transfer mobilization work
Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords