• Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System System 1
  • Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System System 2
  • Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System System 3
Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
99 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System


Use: 

Ledgers are the horizontal members of ringlock scaffolding, they provide horizontal support for loads and planks.


Product description:

1.suitable for buildings like bridges, tunnels, large-scale construction projects, water conservancy project ,ship buildings, and so on.

2.latest wedge lock system is easy assembly and time saving. Due to its high stability and bearing capacity ringlock scaffolding is popular in the world.

3.made by high-strength welded pipe (48X3.0-3.5mm).


Surface finishing: 

Hot Dipped Galvanized ( HDG)


Specification:

Length(mm)Weight(kg)Material
7323.25Q345

1088

4.55Q345
14005.67Q345
15726.29Q345
20728.20Q345
25729.90Q345
307211.71Q345

Others Accessories:

Ledger, Standard( Vertical), Base Collar,  Steel Plank, Screw Jack etc.



Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System

Q345 Ringlock system ledger / Horizontal / Runner/Ringlock Scaffolding System




Q: Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q: A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
the HOW is that if he moves 1/6 of the way to an end, then he's 1/3 of the way from that end and 2/3 of the way from the other end. The tension from the platform doesn't change, but the tension from the man on either rope is inversely proportional to his distance from either end; in other words, he's 1/3 of the way from the right end, so 2/3 of his mass goes to tension on that rope; he's 2/3 from the other end so 1/3 of his mass goes to tension on the left rope. the rest is just math!
Q: Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
Q: I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q: Can the fifteen typhoon blow up the three - storey house?
Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords