Build-in Cable and high quality portable charger with capacity 5000mah portable for mobile

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Specification:



Battery chip:

li-polymer battery

Charging model

CC/CV (Constand current-constand voltage)

Input voltage:


Output voltage:


Max current:

1500 Ma





Batery life:

charging time ≥500times

Packing &Shipping:

1.Conventional pack

2.1pcs Product/Data line/Colour box


1. With cable build-in,dual USB output,can charging two mobile phone at the same time,

2. Intelligent control,Microcomputer intelligent power monitoring,
4. Non-operating automatic sleep, to prevent power loss.
5. multifunction machine, Apply with all USB charging equipment ,For example  mobilephone,MP3,MP4,GPS,bluetooth,digital camera and so on.  
6.Plug and play,use usb port to output the power supply,Plug in usb data cable ,you can charge your equipment at anytime, anywhere,don’t need to bring severial chargers ,
7.The include adapter can apply for different brand mobile .

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the purpose of the reserve requirement?
D is the answer. Not A. First you look at WHO controls the reserve requirement. Govt. Central Bank. Option A cannot be the answer as it is not an objective of the govt. Govt looks at social welfare of its citizens. The public deposits is the money the govt owns (not the consumers' money, pls do not misinterpret.) By ensuring proper accountability of the reserve req, the interest rate and hence value of the public 's money is ensured. Hence, it allows the govt to retain or even inc the value of public deposits to being about public welfare when it is spent (on infrastructure healthcare, etc.)
Q:Question about Power of Attorney?
Power of legal professional signifies that the holder of the energy can constitute the character in authorized concerns, make clinical choices, and different most important object or movements. Even if the character is eighteen, the character with the energy of legal professional can act for the grownup, make clinical choices and monetary concerns.
Q:What is the green pic with the lightning in black ops 2?
In the lab there is the same symbol if someone puts a turbine there is will power to the bank basement door with the same symbol and open it. Down there you will find the pack a punch machine parts which you put together and get pack a punch.
Q:the solar powered aeroplane, that flew unmanned in the american desert for?
No. It uses power from the Sun, and if it did not receive power from the sun it would stop functioning. It is able to continue to operate at night or in heavy overcast conditions on banked power (batteries, or other), but only for a limited time (That might be one of the reasons it was operated in the desert). A true perpetual motion machine would be one which did not take energy from anything outside of itself. Such a thing is impossible.
Q:Power Supply Burn In Process?
Sure. It means your power supply, the one you have in your hands, has been operated on a load bank that draws the maximum rated power from the supply for a specific amount of time. It is similar to having an automobile engine run on a test stand at maximum design RPM for a specific amount of time. It is a good thing. Typically a sample of the production run is tested, perhaps 1 in 50, this way and all are plugged in for a few moments to make sure they operate and produce acceptable voltages but that test fails to isolate marginal components. The power supply normally won't be operated long enough for the whole power supply to get to full operating temperature. Temperature is what kills electronics. As components get hot their values change. That change is frequently in the direction that allows more current flow. More current means more heat and this vicious circle continues until something smokes and the supply stops working, best case, or it sets something on fire, worst case. The company that built your supply cared enough to test every supply it makes to the same degree as the cheaper companies test sample supplies. You shouldn't have any trouble with a unit tested this way. At least not for a long time. Congratulations, it sounds like you have an eye for the better stuff on the shelf.
Q:can i charge power bank on 550 Mah wall charger ?
First, you should know that ONLY BATTERIES have mAh ratings. The h means hour. Chargers have only mA or A ratings. No h. Ever. Since 550 mA is only a little more than 25% of 2 A (2000 mA), there should be no problems. Phones have charge controllers in them, so that should work, too.
Q:Christianity and Blood Cord banking?
Do you ever use medication?? Or do you just trust God will heal you with any medical intervention? Do you not believe that God allows the advance in medicine so more people can be helped? I do not see a conflict here, however, I am not convinced about all the hype around cord blood. I know everything breakdown overtime, so how can the blood survive 10-20 or even more years?
Q:My Power Bank doesn t charge please help:(?
Keep trying to charge it. Unplug replug it every 30mn until it catches. You can only charge it via the micro USB and discharge it to charge your phone through the standard USB port, or it will be damaged.
Q:can a wind generator power a central house air conditioners?
While I'm not sure how much power your air conditioner will need (different units have differing efficiencies) but for a first approximation we might guess around 5KW. 5KW is on the larger side for residential wind turbines, but should be possible. Next problem is how much does the wind blow, if it is constant, or at least constant when you need air conditioning, then you don't need much of a battery bank. But you'd be lucky if that was the case, if you do need to store power for when the wind is low, then the turbine need to be sized to run the AC and charge the batteries, so an even bigger turbine will be needed. As you can see how much wind you have is a critical factor. A for size of battery bank, just to make the math easy I'll assume you need to store enough power to run the AC for 10 hours (this is just a wild guess, it might be far different) 5KW x 10 hours is 50,000 watt/hours, on Wikipedia I found a claim that typical energy density for lead acid batteries for this application is between 30 and 40WH ber kilogram, using the average, you'd need around 1400Kg (~3000lb) of batteries. There are really too many variables too give a good answer here, if you would have no problem spending $20,000 (and wouldn't totaly freakout over $50K+) then contact a local consultant for more information. If you can't afford that, it is probably not really worth giong any further since $20K is at the very bottom of the price range for that size of instalation.
Q:Why are home forclosures and bank failures increasing in 2012? Are Obama's supernatural powers diminishing?
This is just the domino effect of the HOUSING BUBBLE of 2008 still at work here and the current Obama administration with its taxes, interest rates, is not helping the problem. Plus banks are sitting on the money so it gathers interest and NOT loaning any.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range