• HIGH EFFECTIVE  CUP LOCK SCAFFOLDING SYSTEM System 1
HIGH EFFECTIVE  CUP LOCK SCAFFOLDING SYSTEM

HIGH EFFECTIVE CUP LOCK SCAFFOLDING SYSTEM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin: China (Mainland)

Scaffolding: Cup-lock scaffolding

Quick lock scaffolding: Cup Lock Scaffolding for Sale

 

Packaging & Delivery

Packaging Detail: Scaffolding,Pallet or in bulk

Delivery Detail: Scaffolding,30 days

 

Specifications

Scaffoldings.

 

Character:

 

  1. Simple structure.

  2. Safety and Steady.

  3. Multi using

  4. High loading

  5. Re-used

 

Components:

Name

Size

Material

Tube size

Surface

Theoretic weight

Vertical Standard

1000mm

Q345 Steel or Q235 Steel

Φ48.3*3.2mm

Painted

4.97kg

1500mm

7.46kg

2000mm

9.94kg

2500mm

12.43kg

3000mm

14.91kg

Ledger

600mm

Q345 Steel or Q235 Steel

Φ48.3*3.0mm

Painted

2.34kg

900mm

3.35kg

1000mm

3.67kg

1200mm

4.40kg

1500mm

5.33kg

1800mm

6.32kg

2000mm

6.90kg

 

Q:Single double scaffolding distinctionPlease list the sketch map
Single row of scaffolding is generally used for internal wall plastering, brush paint, and so do not need to bear the work of a single row of scaffolding need to hold the pole against the wallChinese now used in the steel pipe scaffold material made of steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. The materials and structures to proceed, and can be roughly divided as follows:Material division according to bar
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
If the scaffold weight is uniformly distributed, each rope will support one half of the weight. Left reaction = 95N Right reaction = 95N The 710N worker is standing closer to one end (assume left). Sum moments about the left end = 0 1m * 710N - 3.3m * Right reaction = 0 Right reaction = 710/3.3 = 215.2N Sum forces in Vertical direction = 0 Left reaction = 710 - 215.2 = 494.8N Sum all forces Left reaction = 95N + 494.8N = 589.8N larger tension force Right reaction = 95N + 215.2N = 310.2N smaller tension force
Q:How to calculate the cost of scaffolding
The general case is to artificial fee fee based fees, high-rise building scaffolding demolition charges, high fees are in fixed price as the base fee of labor costs, but the valuation when high costs denominated base also includes the high-rise building costs, labor costs and fee scaffolding. In addition, the rates are different, you should refer to the various regions of the fixed fee rate, hoping to help you!
Q:Hi people, just wondering if the main Angkor Wat temple is still under restoration/renovation with all that green tarpaulin and scaffolding on it?I'm wondering when that will be off as it might obstruct the amazing views.Is there any restoration schedules?thanks!!
Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
Q:How bad? :/ i'm a real baby when it comes to this stuff
I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
Q:From the book quot; The Scarlet Letterquot;
He says no. ---- They're, Their, There - Three Different Words. Careful or you may wind up in my next novel. Pax - C
Q:I just got my scaffold piercing yesterday, (the bar through the top of your ear) and one side is kind of swelling. Is that okay, or normal?
this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
Q:Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of? What is the difference
In general, all scaffolding are used to build a bowl buckle scaffold, and rarely use fastener scaffolding to take,
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:How much is the adjusting range of the scaffold of the bottom
Two, full scaffold installation requirements(1) the installation of the frame from the beam to the other end of the start, from the vertical and horizontal at the same time in the two directions, so as not to support instability. (2) all the rods used for supporting must be used before being tested.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products