• Backhoe Wheel Loader (HQM388) with CE, ISO Certificate System 1
  • Backhoe Wheel Loader (HQM388) with CE, ISO Certificate System 2
Backhoe Wheel Loader (HQM388) with CE, ISO Certificate

Backhoe Wheel Loader (HQM388) with CE, ISO Certificate

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Backhoe Wheel Loader (HQM388) with CE, ISO Certificate

Product Details

Basic Info.

Model NO.:HQM388

 

Type:Large Loader

Usage:Universal Type

 

Scraper Type:Front End Shovel,Backhoe

Transmission:Hydraulic Transmission

 

Walking Mode:Wheeled

Load and Unload Method:Front Discharge

 

Engine Power:<74kw

Certification:CE, ISO9001: 2000, SGS,Rops&Fops

 

Condition:New

Color:According to The Customers Requirments

 

Connection:Overall Connection

Engine:Cummins or Yto

 

Operating Weight:7600kg

Warranty:1 Year

 

Export Markets:Global

Additional Info.

Trademark:Haiqin

 

Packing:1 Unit in One Hq40 Container

Standard:CE, ISO, SGS, ROPS&FOPS

 

Origin:Shandong, China

HS Code:84295100

 

Production Capacity:8000 Units / Year

Product Description


Backhoe wheel loader WZ30-25 specifications: 

Overall Dimension
1, Length X Width X Height 5900X 2300 X 3769(mm)
2, Cab roof height:" 2900(mm)
2, Wheel base: 2250(mm)
3, Track :1640(mm)
4, Min. Ground clearance :300(mm)

Main Technical Specification: 

1, system pressure
Load hydraulic system :18Mpa
Dig hydraulic system: 20Mpa
Steering hydraulic system :12Mpa
2, system flow :120L/min
3, four-wheel drive, whole hydraulic system
4, total operating weight :7600kg
5, maximum speed 22Km/h
6, maximum gradient capacity 30°

1, loading bucket capacity :1m3
2, rated loading :1800KG
3, maximum articulated height of bucket: 3400(mm)
4, bucket discharge height: 2795(mm)
5, bucket discharge distance :1048(mm)
6, loading lift capacity: 25KN
7, bucket hydraulic translation function: yes
8, bucket lift time: 6.8s
9, bucket lower time: 2.5s
10, bucket discharge time :1.2s
11, maximum tractive force :39KN
12, maximum breakout force: 38KN

1, backacter bucket capacity :0.3m3
2, backacter discharge height :3878(mm)
3, maximum digging depth: 4080(mm)
4, maximum digging radius: 5688(mm)
5, bucket slewing angle 190°
6, bucket digging capacity 46KN
7, bucket stick digging capacity 31KN

Diesel engine
1, model YTO YTR4108G60-1 LRC4M-3G93 or Cummins engine. 
2, type inline, directinjection, four-stroke, liquid cooled
3, rated power 75HP 90HP
Rated speed 2400r/min 2400 r/min
4, cylinder. Internal diameter 4_105 4_110
5, maximum torque 285NM 310NM
6, minimum fuel consumption 239g/kw. H 245g/kw. H
7, displacement 4.33L 4.5L

Transmission system
1, model of hydraulic pump fixed shaft power shift transmission
2, gear shift 2forward shift 2 reverse shift
3, torque YJ-280
4, drive pump CDXaf3016-IL
5, flow 16ml/r
6, work pump CBGj2063
7, flow 63ml/r

Steering system
1, type articulated hydraulic steering
2, model of steering control valve BZZ5-250
3, model of turning control valve YSF25S-00
4, steering angle 36± 1° Left or right 36± 1°
5, minimum turning radius 5018(mm)

Wheel
1, tire size 16/17-20
2, front wheel pressure 0.22Mpa
3, rear wheel pressure 0.20Mpa
4, service braking air over hydraulic disc on 4 wheels
5, parking brake manual parking brake

Operating weight7640KgFinal ReducerSingle stage final reducer
Transportation dimension L*W*H5910x2268x3760mmRated Loader of Axle7.5t
Wheel base2250mmTransmission system
Torque Convertor
Min. ground clearance300mmModelYJ280
Loading bucket capacity1.0m 3TypeSingle-stage, Three elements
Breakout force38KNMax. efficiency84.4%
Loading lifting capacity2500kgInlet pressure0.4Mpa---0.55Mpa
Bucket dumping height2742mmOutlet pressure1.2Mpa_1.5Mpa
Bucket dumping distance1062mmCooling methodOil-cooling Pressure Circulation
Digging depth52mmGearbox
Backhoe capacity0.3m 3TypeFixed shaft power transmission
Max.digging depth4082mmOil pressure of clutch1373Kpa --- 1569Kpa
Swing Angle of Excavator Grab190 °GearsTwo gears forward, two gears backward
Max. puling force39KNMax. Speed22Km/h
EngineTyre
ModelYTR4108G60-1Model16/70---20
TypeVertical, direct inject,
4-stroke, combustion chamber
Pressure of front wheel0.22 Mpa
Pressure of rear wheel0.22 Mpa
Cylinder-Inside diameter*stroke4---108*120Brake system
Rated power55KWService brakeAir over oil caliper brake
Rated speed2400r./min.External type
Min. fuel consumption≤ 216g/km.hSelf-regulation
Max. Torque≥ 261.7N.M/1800r./min.Self-balance
Displacement4.4LEmergency brakePower asst.
Manual asst.
Steering system
Model of steering deviceBZZ5---250Hydraulic system
Steering angle± 36 °Hoe bucket digging power46.5KN
Type5018mmDipper digging power31KN
Model of tuming control valve12MpaBucket lifting time5.4S
AxleBucket lowering time3.1S
Main transmission typeDouble reductionBucket discharge time2.0S

Backhoe Wheel Loader (HQM388) with CE, ISO Certificate

Backhoe Wheel Loader (HQM388) with CE, ISO Certificate


Q: Hai I am working into sales with excavator field ,i want start a small skill industrie pls guideme good bussi.
Hello, Sounds good.... Just make a website for your business advertise through online. Good Luck......... with regards, Raom
Q: What is the distance between the rigger and the excavator?
Distances between riggers and excavators vary. It could be a couple of feet or thousands of miles.
Q: My thoughts are (since it really is a huge, run down area of landscaping in the front of our house) is to rent a small/med/large? excavator and literally rip out all of the remaining, overgrown landscaping old, large cement steps that are in place. It is a huge job to do by hand the last landscaper I spoke with quoted me 2-3 grand or more, we would really rather do this ourselves save alot of money if possible!
If you don't know how to run an excavator, you'll more likely cause more than 2-3k damage. Plus, unless your a certified operator, they wont let you rent one anyways, and they are outrageous to rent. Hire someone to just do the excavation, and do the rest yourself. If you insist on removing the shrubbery on your own, cut it down and yank the roots out with a chain and 4wd truck. As far as the concrete, well unless you want to spend the entire summer breaking it up and hauling it off...disposal wont be cheap, you'd be better to hire it out. See if you can find a small independent who will give you a better price. They're out there and hungry, shop around.
Q: hi,i would like to know if my 2 children and my wife would have a better life in france than the uk?i am a hgv driver/excavator operator and i am looking to life and work near to brittany??thanks
I would say France is better but - you must all learn the language and learn the local way of doing htings.
Q: I work as an architectural draftsman for an architectural firm. I currently have an associated degree in drafting and design and am planning on getting a bachelors in construction engineeing technology. Would this degree be helpful in the archiectural field or should I pursue something else? (I do not have the option of getting an architecure degree)
may I suggest a job in grave yard as a real-estate excavator. If you have been working in the field and don't already know. it is obvious that you should be doing some thing else like digging graves or ditches. after all I am sure that you are waisting perfectly good natural resources in your current position How does it feel to know that your only contribution to this world is waisting AIR and Global warming
Q: I am just desperate now! I am wondering if any ps3 people could help me get this trophy because i have tried countless times and am just sobbing that this is so hard(jk). so if any kind person who has gotten it or can help is willing to, I can get 3 of any answerers and we can all do it. ThanksSincerely,a very annoyed person at black ops's difficult trophies. :D
it doesn't matter when it breaches, as long as it does it once. Step 1) when the power has been turned on, you'll need to play a game of Samantha says on the four computers in the outside area with no gravity, near the quick revive. Step 2) Hack one of the four buttons in the lab, this requires you to have found the hacking device that lays around various tables.
Q: I opened the access door on the side of the track thinking there would be a standard zerks fitting but found none. Is there a special grease fitting needed?
Use titanium silicone tritium lubricant with a 7/16th metric lug nut!
Q: I was recently digging a post hole and scraped my undergound electric cable. The post hole digger damaged the insulation and scraped one of the wires. It sparked a lot then started smoking. I still had power to all parts of my house. The wire was not cut in half. Only the casing was damaged. In fear of being charged by the power company to repare the damage, I simply filled in the hole. Can anyone tell me if I can expect the exposed wire underground to give me any problems?
You really need to call the power company and have it looked at. You should always call to get your property located before you dig. Most companies- at least where I live do this for free. Just feel lucky it wasn't a gas line!
Q: What card does excavator driver need to mount guard?
For the driver of the excavator, the required certificate is: Excavator operation permit.Excavator (loader) operation certificate, namely: by the Ministry of labor or Safety Supervision Bureau approved the formal operation card (also known as the certificate of work, also known as IC card), type of technical certificate and various certification. Also known as "special operations operation card", is engaged in special types of work personnel must be familiar with the corresponding special types of job safety knowledge and prevention of various accidents skills. Practitioners must be required to hold (IC card) posts, that is, by the State Administration of work safety issued the "People's Republic of China special operations permit" before the job, this certificate nationwide. The old version of the certificate is reviewed every 2 years, and the review of the new special operation permit is reviewed 1 times every 3 years.
Q: Im 17 years old and im looking for employment just somewhere simple that any kid in highschool would work.this is the first resume i've ever written and i was just looking for some feedback and advice for areas of improvement. basically what i want to know is if you were a hiring manager and you looked over my resume would you call me in for an interview?
Looks way better than my resume at age 17 I tell you that. Here are some suggestions Make your experience description in bullet points similiar to your volunteer and interests. Use action verbs like initiated, lead, pursued.. words that show you are proactive. For example: Construction: - Activity 1 (construction of roofs, floor, ....) - Activity 2 (cleared forest vegetation....) - Responsiblity 1 (list if you had any) - Projects finished 1 (cleared entire section of forest, finished an entire house.. etc..) Do this for each place you have worked. Also, make sure you list your most recent experience at the top because employers will want to see them first. The lines about able to stand for hours, work well alone or with others, motivated, etc.. You can remove them and put it a cover page if you have one. Because they sound cheezy and the fact that EVERYONE says that. Most employers don't even read them. Your objective should be focused. Not bus management, or culinery arts, or retail. Pick one depending on your employer, you should focus on one. This way your resume will seem more directed at the position, rather than a generic resume that you mass produce.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords