Product Description:

Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.

 

Construction:
•Inner frame: High quality extruded aluminum alloy(A6063).
•Out frame: High quality extruded aluminum alloy(A6063)
•With gypsum board

 

Size:

4"x6",6"x9",8"x8",12"x12",14"x14",22"x22"

 

 

Attributes:

 1.Easy and quick installation,fixing by screws or clips.

 2.High-class quality, perfect design, light weight but strong bearing capacity,

 3.Mildew resistant, does not change color,corrosion proof,long life,light weight, no weld, and low cost.

 

Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.

 

Surface Finish:
•Powder coated color finish as per RAL color---- standard color: RAL9016

 

Character

Easy and quick installation
Continuous one-piece frame with feathered edge
High-class quality, perfect design, light weight but strong bearing capacity, no rusting and keeping forms.
Mildew resistant.

 

FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

Picture

Access Panel Strong Bearing Capacity For Gypsum Board

Access Panel Strong Bearing Capacity For Gypsum Board

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the steps behind the construction of the building after the closure?
Hurry to do roof insulation, waterproof ah! If you encounter rainy season, do not do waterproof on the trouble ah!
Q:The settlement area of the doors and windows is calculated by what size
If the size of the settlement unit by the construction unit you are smiling, it is possible to open a small hole, there may be wrong calculation of the construction unit, there may be your construction drawings taken wrong, the construction unit should take 1800 * 1200 hole
Q:Do you want to eat the windows and doors?
Yes, but can not eat too much. Eat too much, then the pressure line can not afford to unload, and the glass will not drill into the
Q:Four-wheel positioning adjustment screw how to install
Four wheel positioning adjustment screw how to install == best in the four wheel positioning - look at the data after adjustment
Q:Do window frames be flush with walls or on wall centerlines?
Can be; in the construction of the general requirements are installed in the wall of the center line; but their own post-installation (such as plus double windows), can be flush with the wall. There are several kinds of door sets, two of which is the center line installation, which is conventional; then there is flush with the inner wall, the door is deeper, in the decoration called large package, the effect is also good; most hotel rooms are so of.
Q:The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
The horizontal line of the window to determine the level of the installation of the window; entry and exit line on the window side and the inner wall of the flat, or highlight the size (press Decoration requirements), steel windows, aluminum windows every wall center line.
Q:Glass curtain wall and doors and windows to do what information? Do you want to do some information when you install the doors and windows frame? The
Sub-box, lightning protection, waterproof, the main frame and the sub-frame connected to the screws, these are hidden, to cover the acceptance records, the rest do not need to attach the form, the main frame is installed, with inspection batch form, glass ibid.
Q:Plastic door and window frame dirty not clean how to do?
You want to see what is above, we give the program! Is it going to clean up or intend to change a window!
Q:Engineering materials inside the windows and doors hidden when to do? Is done in the main construction, or do the decoration when the doors and windows to do the decoration?
Is the main body after the end of the construction to do, after the main body, according to the actual situation of the project, generally at the same time outside the wall, interior walls, ceiling painting, while the installation of doors and windows, and then floor, and then the interior wall and ceiling paint , Wood partition, door and window fan installation, construction generally from top to bottom.
Q:Is not all the doors and windows are located in the middle of the wall?
Not necessarily, depends on the design. Building exchange group

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range