Is foam concrete suitable for use as a cushion?
The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
Why calculate the amount of time to count a lot of cushion ah
? In the municipal engineering, the bedding layer is a structural layer between the grassroots and the soil foundation. When the soil temperature is bad, the water temperature of the soil is improved and the water stability and frost resistance of the pavement structure are improved. Diffusible load to reduce soil deformation.
Roof waterproof mattress should play the number of centimeters appropriate
Roof leaking of the construction program: ? 1. Need to remove the previous waterproof, such as paint, coil, etc., if it is to do the mortar waterproof can not be eradicated.
How to build a fine stone concrete cushion?
The cushion is primarily responsible for the load coming from the surface and passes the load evenly to the structural or base.
When the cushion is used, the thickness of the protective layer is not less than ()
Not on the roof: the general waterproof layer above can be used 15 ~ 25mm cement mortar protection.
The roof cushion is waterproof on the slope roof
When the moisture generated by the ice dam into the external walls of the gap, the walls and insulation layer will become damp, which is the ideal environment for the breeding of mold.
Basement cushion waterproof
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Can the floor tiles be removed from the cement mats on the prefabricated board floor?
You can dig, but be careful not to use a strong earthquake with the machinery to remove, otherwise it will damage the original structure.