Staple Fiber Nonwoven Geotextile

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

made of polyester or polypropylene fiber
good burying, hydrolyzation & corrosion resistibility

Density

Thickness

Breaking Strength

Elongation of Fracture

CBR Bursting Strength

Vertical Penetration Parameter

Equivalent Aperture

g/m2

mm

KN/m

%

KN

cm/s

O95 mm

65

1.2

2.8

40 ~ 80

0.7

K x (10-1 ~ 10-3)

(K = 1.0 ~ 9.9)

0.07 ~ 0.2

75

1.4

3.3

0.8

100

1.6

5.0

0.95

150

1.52

7.5

1.5

160

2.0

8.5

1.60

200

2.4

11

2.10

250

2.8

14

2.60

300

3.4

16

3.20

400

4.0

21

4.0

500

4.5

25

4.8


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Roof waterproof mattress should play the number of centimeters appropriate
  2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.
Q:Basement floor mattress dry to what degree can do coil waterproof?
Second, when the design of the highest groundwater level above the bottom of the basement floor, you must do waterproofing. As the waterproof waterproof effect is good, so the application of more. Internal waterproofing is generally used for repair works.
Q:What is the relationship between the cushion and the ring beam?
Cushion is plain concrete or asphalt concrete (for groundwater soil corrosive strong site). Is located below the ground, in order to prevent the foundation or the concrete beam pouring when the excessive loss of water caused by defects set. The purpose is to ensure the quality of concrete, increase the durability of underground components
Q:Do you need a cushion on the ground floor?
As well as the time to build a wooden building with concrete pier, from the ground or contact the ground to do a good job preserving.
Q:What is the waterproof layer and the waterproof cushion in the tile roof?
In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Is the raft cushion waterproofing full of the cushion?
The request is full. Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do.
Q:The cushion is usually in the housing which parts
First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
Q:Large area ground concrete cushion seam Why is the separation of joints generally concrete
hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
Q:What is the difference between leveling and cushion?
Commonly used materials are, cement mortar leveling layer, fine stone concrete leveling layer, asphalt mortar leveling layer and so on. Leveling layer and the difference between the cushion, which is a very easy to confuse the two engineering concepts.
Q:Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range