Tower Crane Use for Industrial Building

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Tower Crane  Description


Feature: Tower Crane                         Condition: New                               Application: Construction          

Max.Lifting Load: 8T                              Max Tip Load:1.6T                         Independent Height:44M

Max Lifting Height: 146M                        Span: 55m                                     Certification: CE,ISO

Place of Origin: China(Mainland)           Model Number: TC5516         

 

Packaging & Delivery of Tower Crane 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Feature of Tower Crane


● Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.


● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability.


● Reduce future maintenance cost.


Tower Crane Specifiction


Tower Crane Use for Industrial Building

Tower Crane Use for Industrial Building

Tower Crane Use for Industrial Building


FAQ of Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane. 


Q: What kind of steel used for tower crane?

 A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.


Q: Your tower crane is similar to Potain or Liebherr type? 

A: We could develop any type of tower crane as per clients’ requirements if the clear information is provided. Originally, our tower crane design is based on Liebherr; but now, we not only introduced Potain design; but also developed special tower crane according to the market needs such as TC5013A with panel mast section. In addition, we also produce some models same as Potain original model, such as F0/23B, H3/36B and etc. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a tower crane without a collector?
Without the collector, the main cable of the tower crane directly reaches the power distribution cabinet after turning.
Q:What are the main technical parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
1 self lifting tower cranes with counterweight are common tower cap tower cranes, plate type tower cranes and flat head tower cranes, characterized by a counterweight made of several concrete on the balance arm,
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
Before the installation and disassembly of 2.0.10 tower cranes, special construction plans shall be worked out to guide operators to perform installation and disassembly operations. The special construction plan shall be prepared according to the actual conditions of the product specifications and the working site of the tower crane, and shall comply with the requirements of the relevant laws, regulations and standards. The special construction plan shall be examined and approved by the technical, safety and equipment departments of the unit, and approved by the technical person in charge, and shall be approved by the supervision unit.2
Q:How to install the jack up tower crane 30How to install the jack up tower crane?
1, since it is self lifting, as the name suggests, is to rely on their own strength, without other cranes can rise.2, it has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the.3 crane refers to a certain range of vertical lifting and horizontal moving heavy lifting machines. Also called crane. At present the Guangdong SHUNFA hoisting lifting equipment limited company has gradually cancelled lifting driving function. The main features are: the tyre crane driving cab and lifting control room, is be made one crawler crane (crawler crane) evolved, the walking tracks and walking mechanism to support part of the tire chassis, overcome the crawler crane (crane) damage caused by the defects of trackboard pavement, belongs to the material handling machinery. Lifting equipment is characterized by intermittent exercise to do some work, namely the corresponding mechanism, taking in a working cycle of transport and unloading action is the turn of the job, the crane in the market development and the use of more and more widely. Because no leg lifting and lifting driving often appear some accident, driving faster than the crawler crane (crane); stable operation, large lifting capacity, lifting, walking road, but must ensure smooth solid tire pressure to meet the requirements, hanging from the ground not more than 50CM in a certain range is prohibited; with a load of long distance. In order to ensure the safety of operation, the lifting operations are not allowed to be carried out at home.
Q:Can the tower crane personnel install the construction elevator?
As for the hoisting equipment, the licensed crane erection worker can install the construction elevator.
Q:What role does the tower crane torque limiter play?
The torque limiter can play the weight overload or working radius beyond, beyond the technical performance of the tower crane at the moment, immediately cut off their own lifting or variable power source, will send the alarm signal to prevent the occurrence of accidents.
Q:Protective earthing resistance of tower crane
Q:Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Lifting weight limiter: limit maximum lifting weight;Torque limiter: limit the maximum lifting torque;Height limiter: limits the maximum and minimum position of the hook lifting and lowering;Amplitude limiter: limit the lifting trolley in the boom on the outside, the inside position;Slewing limiter: limit of up to the number of rotating ring arm;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range