QTZ63(5013) tower crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ63(5010) tower crane is hoisting and conveying machinery which is designed by our company by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 700kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 32.2kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.
2. Lifting Technical Performance

2.1 Lifting Performance Table and Lifting Performance Curve

(1)4-magnification Lifting Performance Table(48m)

 

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

25.5

Allowable working temperature

0C

-20~+40

2.1 Hoisting and Lifting characteristic curve characteristics table

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-12.5

13

14

15

16

17

18

19

20

21

22

Lifting capacity
(t)

4

3.832

3.534

3.276

3.050

2.850

2.673

2.514

2.371

2.242

2.124

Amplitude(m)

23

24

25

26

27

28

29

30

31

32

33

Lifting capacity
(t)

2.017

1.918

1.828

1.744

1.667

1.595

1.528

1.466

1.407

1.353

1.301

Amplitude(m)

34

35

36

37

38

39

40

41

42

43

44

Lifting capacity
(t)

1.253

1.207

1.164

1.124

1.085

1.048

1.013

0.98

0.949

0.918

0.89

Amplitude(m)

45

46

47

48

49

50

Lifting capacity
(t)

0.862

0.836

0.811

0.787

0.764

0.742

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-23.9

24

25

26

27

28

29

30

31

32

Lifting capacity
(t)

2

1.99

1.90

1.81

1.74

1.66

1.60

1.53

1.47

1.42

Amplitude(m)

33

34

35

36

37

38

39

40

41

42

Lifting capacity
(t)

1.37

1.32

1.27

1.23

1.19

1.15

1.11

1.07

1.04

1.01

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity
(t)

0.98

0.95

0.92

0.90

0.87

0.85

0.82

0.80

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to interpret tea leaf symbol in terms of time of a standing bird that is a crane/egret/heron, with it s beak body facing to the right?
Cranes are an extremely ancient symbol, there are folkdances based on their courtship display in many parts of the world, and evidence of this in prehistory too. Excavations at the ancient city of Catal Hayuk in Turkey uncovered the wings of a crane which seemed to have been part of a dancer's costume (google crane dance). Herons and cranes stand around waiting patiently for fish to come along and then move swiftly
Q:I have some cranes in our field next door and I was wondering do they eat chickens? I live in Wisconsin.?
Nope, cranes don't eat chickens
Q:How Much Can the Most Powerful Crane Lift?
Those stones are small compared to what cranes can lift. I did find this Liebherr the heavy equipment company have developed a new all terrain nine axle mobile crane that is the worlds most powerful. The Liebherr LTM 11200-9.1 has a maximum lifting capacity of 1,200 tons with its powerful 100 metre (328 ft) telescopic boom. another: Deira City Centre was the crane’s first lift as it assisted in completing the work in less than 30 hours in what would have otherwise taken an approximate 20 days. The monster machine can lift up to 1,200 tonnes and cover an area over 100m wide. The operational weight is 96 tonnes and the total counterweight is 202 tonnes. Average weight of the stones in the Great pyramid is 2.5 tonnes. So either of those cranes could lift over 400 of these at once.
Q:What is the breeding season of cranes?
Mid-April to mid-June is breeding season for Florida Sandhill cranes lasts from December-June. For most other cranes, like those here in the midwestern U.S., the breeding season is March and April. I'm fortunate enough to live not too far from the Jasper Pulaski Fish and Wildlife Area where the Sandhill Cranes migrate every spring and fall. I always go to see this spectacular event.
Q:How should we select a appropriate crane for a particular job ?
What is the load weight? How high is the lift? Obstruction, possibly needing a jib? If you are placing a load onto a roof, how far from the edge of the roof is the load going to be placed? How far from the crane pivot is the load on the ground and how far are you going to to move the load away from the crane to place it in position? How close can you get the crane to the load and to the load placement site. The usual scenario is to call a crane outfit and they will ask you these questions over the phone or come to the site and discuss the lift with you. A crane is rated for maximum lift as close, usually 10 feet,to the cab pivot center. As the distance increases, the maximum load that can be lifted, decreases. Our 15 ton crane can pick 15 tons/ 30,000 pounds at 10 feet from pivot center. With the boom fully extended; the boom is 100 feet, at a 30 degree angle, it can pick up only 5,000 pounds. Inside of every crane cab should be a chart that shows the lift capacity at various boom angles and boom lengths. Also is included is a chart for the Jib, if the crane has one. Wingman
Q:Maggie: Girl of the Streets by Stephen Crane?
I studied in in university - it's contemporary to when it was written, so it may as well be set in 1893. Crane was in his early 20's when he wrote it. He was addressing a societal issues of the day, particularly living in the slums of New York and the shift in American culture/economy from primarily agricultural to industrial. It addressed poverty, disaease, social ills and the dreariness of poor city life. The book was quite controversial when it first came out.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
If you set the tower crane foundation in the foundation pit, which is based on another piling, the general is to help the wall of the tower crane (unless your project in the free height under it), so far away from the foundation by the wall distance set.The two tower cranes are all supported by piles and steel lattice columns in the foundation pit. The distance is determined by the distance between the outer edge of the main structure and the supporting wall.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:Any ideas as to how I can gift 1000 cranes + messages?
A clear Glass vase would be cool, the colors of the cranes would make it decorative, and he could reach in to read one whenever he needs a pick me up. It is especially a good idea for the hospital, since they sometimes frown on flowers for allergy reasons. I also love the idea of a mobile, but that would be huge and time consuming, also the messages would be hard to read. But perhaps you could take 20 and turn those into a mobile, tie them to a stick with sewing thread, and plant the stick in the jar or vase you use to display the others.
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range