Tower Crane TC6024

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 unit
Supply Capability:
2 Sets per Month unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of TC6024

1) CMAX TC6024 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specifications of TC6024 

 

Max load capacity = 10T                                                  

 

Jib length= 60M 

Tip load = 2.4T@60M                    

 

 Free standing height= 50.5M    

 

  Panel type mast section= 2X2X3M  

Packaging & Delivery

40HQ container

20~25days after deposit

TC6024TC6024

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical.
Q:How did the tower crane rise on the construction site? Fifteen
It's not a cable, it's a steel bar! Scaffolding
Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:Tower crane and tower crane 5
Vertical transportation can be done with elevators, construction lifts, and Longmen racksTower cranes and tower cranes are one thing
Q:What are the safety devices for tower cranes?
(6) the rail clamp is used to clamp the rail, prevent the crane from walking by wind in the strong wind, and cause the tower crane to derail and overturn the accident.(7) the wind meter automatically records the wind speed, and automatically alarms when more than six wind speed is over.(8) the anti stripping device of the steel wire rope is mainly used to prevent the steel wire rope from disengaging from the pulley groove during the transmission process(9) the hook insurance prevents the lifting of the steel wire rope because of the excessive angle or the wrong hook, and causes the lifting wire rope to be broken off and the suspension falling accident.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
Hello, it depends on your design requirements, generally have the pit bottom, straight out of a tower crane base do. Or elevator shaft is also more. Generally, the foundation pit is shallow foundation pit or relatively small foundation pit.
Q:What are the main parameters of a tower crane?
For car luffing tower cranes, the maximum lifting height is only related to the height of the tower, and when the height of the tower is determined, the maximum height of the ceiling is a certain value.In addition to the 4 major performance parameters. And the working speed (including lifting speed, rotary speed and walking speed of car, traction speed), an important parameter gauge, wheelbase, total power, motor structure weight, balance and gross weight, etc.. These important parameters often determine the tower crane selection, such as speed of operation often determines the number of selected cranes, motor power requirements of power supply load, gauge, wheelbase of the site, and the structure weight, balance weight, weight of the foundation treatment of heavy machine requirement.Tower crane (tower crane) is called tower crane, also known as tower crane. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. The tower crane consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
We are a leading manufacturer of a broad range of disposable medical products and durable medical equipments. From 1993, our American Headquarter, Basic Medical Industries Inc. was set up in California USA exploring our initial business of gloves. Over the past 17 years, we has enjoyed unprecedented growth due in large part to the support of our valued customers.

1. Manufacturer Overview

Location SHANGHAI,CHINA
Year Established 2000
Annual Output Value Above US$100 Million
Main Markets

CHINA
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.8
No.of Employees in Trade Department 600 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above138,000square meters
No. of Production Lines Above 2
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average