Tower Crane Max Capacity TC6014 Trolleying
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5613(QTZ80)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6014
Independent height (m) | 46 | |||||
Max height with attachment (m) | 138(200) | |||||
Working range can be adjusted(m) | 48、54、60 | |||||
Min working range(m) | 2.5 | |||||
Max lifting capacity(t) | 8 | |||||
Tip load @ 60m(t) | 1.4 | |||||
Hoist mechanism | Falls | 2 | 4 | |||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | ||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||
Motor | YZRWFC250M-4/8 30/30KW | |||||
Trolleying mechanism | Speed(m/min) | 53/27/12 | ||||
Motor | YZTDE132L-4 /8/16 3.3/2.2/1.1KW | |||||
Slewing mechanism | Speed(r/min) | 0-0.6 | ||||
Motor | YZR132M2-6-3.7KW×2 | |||||
Climbing speed(m/min) | 0.5 | |||||
Counterweight(t) | 17.0 | |||||
Mast section size(L×W×H)m | 1.6×1.6×3.0 | |||||
Working temperature | -40-+60℃ | |||||
Total Power (KW) | 42 | |||||
Power supply requirement (KVA) | 190KVA for generator | |||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||
380V×95%=361V 179A | ||||||
Rated working voltage & current | 380V 128A | |||||
60m jib length:
R (m) | 2.5-22.4 | 30 | 40 | 50 | 60 | ||
a=2 (kg) | 4000 | 3646 | 2630 | 2014 | 1400 | ||
R (m) | 2.5-11.245 | 20 | |||||
a=4 (kg) | 8000 | 5564 | 3573 | 2560 | 1944 | 1330 | |
Images of Tower Crane
FAQ about Tower Crane
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q:What do lattice boom and hydraulic boom in cranes mean?
- LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.
- Q:You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
- The cranes are built in the elevator shafts and moved up as needed during work progress.
- Q:Better actor......Bob Crane or Alan Alda?
- Their TV shows were both very good. It seems Bob Crane has faded out of sight. He is also old by now. Alan Alda has made some good movies. He also does a lot of narrating for documentaries. I think I have to go with Alan Alda.
- Q:No inspector would intentionally overlook a dangerous existing situation re: crane usage in a major city---so what went wrong--never before has this happened and now two majjor incidents?
- I think they are accidents. Unfortunately people who work for the city government - at least in NY - are incredibly incompetent and corrupt. What makes you say that No inspector would intentionally overlook a dangerous existing situation ? That 's exactly what the inspector of the first crane collapse did. Oops, my mistake. He didn't check the cranes at all. And all those people who died recently in construction by being blown off by wind from great heights??!! I have never heard anything like that before. Who gives these people the necessary permits?? How trained are these people? Where is their union?
- Q:I'm not sure how to set this problem up. Any help would be greatly appreciated. Thank you :)
- We start using by defining mechanical Power: = P=Work/time What is the work here? We lift the box a given distance. Work=mgh Since we know the power of the crane, we can simply plug in the values and solve for t: t=mgh/P This is only true if the crane has a constant power, which seems to be the case LeSmartOne
- Q:When the tower crane foundation is found, what should be discontinued?
- The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
- Q:What are the main parameters of a tower crane?
- For car luffing tower cranes, the maximum lifting height is only related to the height of the tower, and when the height of the tower is determined, the maximum height of the ceiling is a certain value.In addition to the 4 major performance parameters. And the working speed (including lifting speed, rotary speed and walking speed of car, traction speed), an important parameter gauge, wheelbase, total power, motor structure weight, balance and gross weight, etc.. These important parameters often determine the tower crane selection, such as speed of operation often determines the number of selected cranes, motor power requirements of power supply load, gauge, wheelbase of the site, and the structure weight, balance weight, weight of the foundation treatment of heavy machine requirement.Tower crane (tower crane) is called tower crane, also known as tower crane. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. The tower crane consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
- Q:in the pit, i just lost my bike cuz johnny's crew tripped me with a chain. so no bike, and i only have my slingshot, skateboard, and some other useless stuff. dont say i can use my firecrackers or stik bombs cuz i dont have any in this pit. Also, my friend,... whatever his name is, he's there on top of the cars and junk and in the beginning he says something about a crane but i cant hear him. so everytime i pass under the crane... my conrtoller vibrates because the crane is supposed to pick up cars and such because its magnetic. so i already tried to see if when johnny goes under the crane it might pick him up because hes on a bike but it doesnt work. and i cant take him off of his bike and steal it either. i was thinking that would work because then whatshisface could pick me up with the crane.and when i try to hit him with my slingshot, it just doesnt work it would take me forever to knock him out with that puny little thing and he has a crowbar and he knocks me out so easily. HELP
- What you have to do is knock out all of Johnny's friends who are above you shooting things down at you. Use your sling shot to knock them out. It will take 2-3 shots for each guy. This will allow your friend to run around to the magnetic crane and start it up for you. Once Johnny goes under the crane, he will lose his bike. Then he'll be on foot, and will be a little easier to kill. Try to make sure you keep as much energy as you can while you're getting rid of Johnny's friends (run around alot so what they shoot at you won't hit you), because you'll need the energy to finish off Johnny. Good luck!!
- Q:I started to make 1000 paper cranes to make a wish come true and before I start I have a few questions. How many times can you make 1000 cranes to make a wish come true? Do you have to string them? And how long do you have to make them?
- You only have to fold 1000 to make your wish come true. It doesn't matter how long you take on them, but they should look acceptable if you'd like to display them. All you really have to do is fold all 1000 cranes; you do not have to string them, but I think it looks very nice. You could also put them inside of a jar. :)
- Q:Has anyone actually folded 1000 paper cranes? i want some proof
- no. But I have read the book sadako and the thousand paper cranes. I was so sad when I read that. I have always wanted to fold A paper crane.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane Max Capacity TC6014 Trolleying
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords