YONGMAO STT553 tower crane

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

INFO:Topless

LIFTIMG:24/20/18T

Tip load:3.55/3.55/4T

ARM LENGTH:80M

HEIGHT:85.6M


Founded in the year of 1996, Yongmao is one of the key suppliers specialized in manufacturing construction machinery and engineering equipment.

We currently offer a variety of tower cranes which are broadly classified under the Topless STT series, the ST series, the Luffing STL series and the Derrick QD series, as well as crawler cranes and modified vehicles.

Yongmao tower cranes have not only been working for various domestic projects like hydroelectric power plants, nuclear power plants, shipyard, wharf, bridge, aerospace etc. but also acting in numerous construction projects all over the world.

Yongmao appreciates the reliance and confidence given by its valuable users all over the world and feels very proud of its ability and capability to contribute value added services to its users both at home and abroad.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a tower crane without a collector?
The advantage of the collector is that the tower crane can be turned on one side without any limit, and how many circles can be turned. The tower crane is basically not equipped with collector, because collector generally needs to be located at the center of the tower's turning center, so it is inconvenient for operators to go up and down.
Q:More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically,
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q:Tower crane and tower crane 5
Vertical transportation can be done with elevators, construction lifts, and Longmen racksTower cranes and tower cranes are one thing
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.
Q:What does "automatic tower crane" mean less than 100 tons per metre?
When you are working on this crane, the weight between the weight and the weight to the horizontal distance of the crane Center shall not be greater than 100 tons.For example, if the weight and crane center level distance is 10 meters, the maximum weight is 10 tons; if it is 20 meters, the maximum lifting weight is 5 tons; if it is 40 meters, the maximum lifting weight is 2.5 tons.
Q:What are the parts of a tower crane? What are their main functions?
Jacking frame: placing slewing mechanism, when lifting tower top, bearing the weight of tower crane balance arm, main arm and tower cap.Standard section: support the weight of tower crane itself and lift the weight of heavy load, and resist the overturning moment of tower crane.Institutions include the followingLifting mechanism: lifting heavy objects.Luffing mechanism: lifting the car to change the rotation center distance.: the upper part of the slewing mechanism of tower crane (including the main arm and balance arm and tower cap) around the rotation center of rotation.Lifting mechanism: tower crane lifting, the upper part of the tower crane elevated hydraulic power system.Walking mechanism: the crane can walk on the track.OtherDrivers’ RoomElectric boxLinkage tableA foundation bearing platform or trackOther safety devices
Q:Calculate the tower crane gantry crane
It includes electric hoist, big car running mechanism, bridge frame, support leg, electrical equipment and so on. Applicable to station, wharf, warehouse, freight yard, construction site, cement product yard, factory, hydropower station and other outdoor work place, also suitable for indoor workshop work
Q:Where can I get the tower crane manufacturing permit?
Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
Q:What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range