• Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300 System 1
  • Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300 System 2
  • Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300 System 3
Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300

Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTD300   Description

Feature: Tower Crane

Condition: New

Application: construction

Rated Loading Capacity: 10ton

Rated Lifting Moment: 1250KN.m

Max. Lifting Load: 10ton

Max. Lifting Height: 100m

Span: 3~50m

Place of Origin: Shandong, China (Mainland)

Brand Name: MEIDA

Model Number: QTD200  tower crane

Certification: ISO,CE,GOST,BV

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Mast section dimension: 2*2*2.8m

Free standing height: 37.5m

Relay elements: Schneider

Rated hoisting capacity max radius: 2ton

Slewing speed: 0.8r/min

Jib length: 50m

Max.lifting capacity: 10ton

Tower Crane Power: 83.1kw

Tower crane Material: Q345B Steel

Tower crane Color: as customers' requirement

QTD300  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

QTD300 Specification

 Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300

QTD300  Pictures

Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300

Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300

Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with CE QTD300

QTD300  FAQ

Q: What kinds of ur tower crane are available now?

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



Q:I am looking for guidance on determining the optimal design parameters for the design of an overhead travelling crane when considering a span of 60m and a lift requirement of 2500Tonnes. If not possible what would be the maximum lift for the same span
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:Can anyone give me a summary of The Veteran by Stephen Crane?
This Site Might Help You. RE: Can anyone give me a summary of The Veteran by Stephen Crane?
Q:need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
Jib Crane Design
Q:I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
lol i was just watching house right now. He got in a car accident and crippled one of his legs and can hardly walk on it sooo he needs a cane. hope it helps
Q:I know that the whooping crane population recovered through captive breeding but how many are left currently (right now).
There were 535 total in 2009--the population increased slightly last year but I have not seen a total for the population of 2010. Deaths can occur at any time so the number changes constantly. The Journey North site counts 281 adults in the wild western population and 106 birds in the reintroduced eastern flock. They did not give a number for the birds in captivity so I cannot give you a total. You can follow the reintroduced whooping crane population and their migration each spring and fall on the Journey North (in fall called Journey South site). They also track song birds and hummingbirds and monach butterflies.
Q:Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
The name of QTZ is the former mechanical standard, Q refers to the crane, T refers to the tower, Z is to indicate the self lifting, and the latter figure represents the nominal torque, the unit is T.M (the standard unit is KN.m)The type of "QTZ63" indicates the hoisting tower crane with nominal lifting torque up to 630KN.m;The type of "QTZ80" indicates the hoisting tower crane with nominal lifting torque up to 800KN.m;
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:The car weights approx 900 kg.Thank you xx
Gravity acts downwards, force = mass x acceleration. Crane acts upwards at same force. As the crane starts to lift the car there is upwards acceleration that causes more force to be generated for a moment.
Q:Hi, I just bought a 12 foot tommy jib crane, for my cannon x1-h1, I also bought a pan and tilt motor that you put on top of the camera mount at the end of the jib and then add your camera on top of your motor mount. This thing is really heavy now, I have to use 40 lbs for a counter weight. On top of that all the weight is making the jib slanted and shooting crooked. So I took off the motor head and just left the camera on there, and it help a bit, but its still crooked. Is there any fix for this other than buying a more expensive stronger jib crane? It shoots great and I know I can fix the video in post, but it just bothers me. Any help?
When you added the pan/tilt head (and the cable) to the camcorder, you exceeded the supported weight rating of the crane and the crane stage. Then, when you put 40 pounds of counter weights on, you went way over the engineered capacity of the crane arm resulting in the bend.
Q:in the karate kid 1984 is the crane kick something they just put in the movie and not real ?
The Crane kick is an actual Martial Arts move it is done in some Hung Ga Kung Fu forms but differently than the one in the movie because it is done without jumping and is much faster the crane kick in the Karate Kid is just a figment of the director and screen writers imaginations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords