Rail TC4808 4T Tower Crane with Good Quality

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

 

Rated Lifting Moment(KN.m)

400

Rated Loading Capacity(t)

4

Max. Lifting Load(t)

4

Tip Load(t)

0.8

Max. Lifting Height(m)

120

Span(m)

47

Free standing height(m)

29

Rope length(m)

400

Working range(m)

3-47

Slewing speed(r/min)

0.7/0.35

Power supply

380V/50Hz

Power Capacity(kw)

25.82

Electric switch box

Schneider

Hoisting speed(m/min)

(a=2)65.14/57.7  (a=4)32.14/15.6/3.5

Mast section dimensions(m)

1.5x1.5x2.2 (block structure)

Main materials(mm)

L140X10 (Angled steel, Q345B)

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What do Red-crowned cranes eat?
Diet okorder.com/.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
Q:Question on cranes?
Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley. At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:the video of the big blue crane wreak?
Big Blue: January 20, 2000: Video of the Big Blue crane accident that happened in the Brewer's Ball Park Stadium on July 14, 1999 in Milwaukee, Wisconsin. Three men lost their lives in the accident. Although the video is only 1 minute and 10 seconds in length, seeing it is an experience you won't soon forget.
Q:When building tall buildings, where is the bottom of the tower crane installed?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.
Q:what is the common material using for crane boom?
Steel, like you said, do you want an exact specification? That will vary by whether it is a very long and slender tall crane or a shorter heavy duty for considerable loads. It may even vary depending on whether the manufacturer has as a goal an extra light weight unit using more expensive stronger steel or is willing to use thicker walls to use more ordinary steel. That is what engineers are for.
Q:how do they take crane off top of building?
Depends on the building. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.
Q:What is the giant crane for in downtown Pittsburgh?
PITTSBURGH -- Construction is continuing downtown on the new, 30-story Three PNC Plaza, which is scheduled for completion later this year. On Saturday, a giant crane from Philadelphia was brought to the construction site on Fifth Avenue to hoist massive steel girders into place. The girders weigh more than 89,000 pounds and will support a third-floor ballroom.
Q:airsoft m4 full stock, to crane stock?
you need a crane stock and a buffer tube for it. the full stock does not use a buffer tube. you simply guide the wires through the buffer tube (once you attach it to the back) and into the stock. then just pu the stock on and put the batteries in and viola! crane stock!
Q:Like pygmies we fight with cranes?
Definition Of Pygmies

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range