• Plie Hammer Hydraulic Pile Hammer for Sale System 1
  • Plie Hammer Hydraulic Pile Hammer for Sale System 2
Plie Hammer Hydraulic Pile Hammer for Sale

Plie Hammer Hydraulic Pile Hammer for Sale

Ref Price:
$100,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plie Hammer Hydraulic Pile Hammer for Sale

Plie Hammer Hydraulic Pile Hammer for Sale

Product Features:

 

1.Leader: three-point support,vertical degree of the leader could adjust around,the contrapuntal of leader can adjust around.

2.Drive mode: external power supply, full hydraulic pressure drive, high efficiency, protect environmental and save energy.

3.Movement: adopt long boat,short boat and support leg mechanism, good stability, move flexible, chassis contact large area, especially suitable for the place that is easy to sink machine.

4.Adaptability: to be hanged diesel pile hammer, hydraulic piling hammer, vibratory hammer, bored pile drilling rig, triaxial linkage SMW.

5.Operation mode: all the actions adopted in manual manoeuvring valve,speed of movement can controlled by the hand feel, safety performance is high, not easy to failure.

6.Transition,transport: the leader could down and up through the amplitude cylinder, packing convenient.



Parameter
Rotary angle360°        
Leader incline

Front inclination 10°,Back inclination 3°                                                                           

Leader oriented center distance 、diameter                                                                 600×102 mm
Rated pressure of hydraulic system20 Mpa
Max lifting force300 KN
Working dimension: L×W11.7 m×8.5 m
Total weight60 T
PaceShort boat pace700 mm
Long boat pace2400 mm
Supporting leg pace1300 mm
Distance from long boat to ground400 mm
Distance from short boat to ground900 mm
Leader diameter720 mm
Main winchSingle pulling force 60KN×2 set, max lifting 30t
Piling winchSingle pulling force 40KN×2set, max lifting 27t
Long boat contact area18.7 m2
Short boat contact area16.7 m2
Motor power22×2=44 KW

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.




Q:What does "driving pile" mean based on dynamic compaction?
For example, now many reclamation, backfill after hanging for a period of time after dynamic compaction, when the upper planning structures, or to strengthen the stability of most with the pile foundation.
Q:What is the difference between piling and piling?
Often hear of pile and pile, so? Pile has little influence on the site and the surrounding buildings, there are vertical pile pressing machine level to control, at night can also work; piling effect on the site and the surrounding buildings, verticality by bidirectional theodolite or hammer line observation, night can not see, can not work;
Q:What are the types of construction piling? What are the characteristics?
The main load of single pile is the cast-in-place concrete pile with rotary drilling holes.The above is the classification of the process, and how many layers are suitable for the construction. This is not clearly defined. It mainly depends on the geological conditions and the superstructure. Who can tell you clearly that it is all Mongolia?.According to the above features you can see, generally divided into two categories, diesel hammer hole, drill hole, Luoyang shovel into the hole is used more, low cost, suitable for Northwest collapsible loess, the pile can eliminate the collapsibility of loess geology, increase the original basis composite bearing capacity. The pipe pile should be chosen according to the address condition, and the construction cost is high. According to the geological difference, sometimes the diesel hammer or drilling machine is needed to carry out the pre boring operation. Rotary drilling drill across the country for a variety of industries (work, the DAB, railways, highways, bridges, etc.), is the best way to operate a single pile.Specific choices are based on geological conditions and superstructure, and geological moisture content is also a key. I am engaged in the foundation construction, any questions contact at any time. Of course, there is a better engineering, ha ha, all kinds of machinery are available, are free equipment, reasonable price appropriate.
Q:I have been using a common type of 260 fence pile driver, I still feel good with the use of, I heard that the loading barrier, pile driver more cattle I'd like to ask if the loader guardrail is practical? What is the daily piling efficiency? What's the fuel consumption? Please let me know when I've got the trouble. I'll try to buy one if I know the right thing.
Yes, I haven't bought it yet. But I've seen others use it. We used for engineering machinery factory is Sichuan Hongtu buy loading guardrail piling machines, but we are state-owned enterprises, state-owned enterprises as you know the loading driver caitaiqicu nearly 200 000 a buy is five.
Q:How do I maintain the hydraulic pile driver I bought?
Pay attention to the following: the type of project to be used; the workload of the project; the geographical environment of the project; and the price the boss expects.
Q:I've heard that the pile driver's pay is high. I want to study. Also please seniors pointing. Be deeply grateful!
However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
Q:What are the requirements for lime mud piling machine?
Cohesive soil content is not greater than eight percent, the more sticky the better
Q:The distance is 400 meters. Is it possible to use 120 of the aluminum core cable? If not, how much cable should be used? Empty 20How big the cable 250KW piling machine, the distance is 400 meters, can use the aluminum core cable 120, if not, the cable for much, much of the air distribution.
Hello, is this pile driver 380V? It's not 3KV or 6kV, is it? If it is 380V, 250KW motor rated current is about 450 security, and the aluminum core cable 240 square in 30 degrees Celsius environment safe carrying capacity of 240, the actual use, 240 square aluminum in the current 240, fever is very serious.
Q:Excavators, pile drivers, how to operate? The master knows,
Simple, first stop the car, push the right handle forward (big arm down), push the left hand lever (small arm out), handle the right (release bucket), do the above three actions at the same time until the bucket touches the ground.
Q:Why should the pile foundation be excavated after the pile driving?
The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords