Highway Monkey Driver

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
1 Sets per Week set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description

Highway Monkey Driver

high quality and famous brand

humanized desiging

competitive price

ISO certificate CE

Highway Monkey Driver

1,  purpuse: Hydraulic monkey pile-driveis special equipment used for driving express highway protective grating.

2,structural features:fluid drive running,positioning,pile driving,pile extraction,it has the features of pile exraction,and quick position and high efficiency ,and stable performance and flexible opration,being applicable to driving construction of different geology.

3,  Main technical parameters:

1)      dimensions:2200×2000×4210

2)      engine power:12.1kw

3)      weight of complete machine:2000kg

4)      hydraulic system pressure:10Mpa

5)      hydraulic system flow:37L/min

6)      weight of hammer head:320kg

7)      impulse force of hammer head:about 3000kg

8)      maximum hoisting height of hammer head:3300mm

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a pile driver used for?
As the name suggests, of course, piling is used, such as building houses, foundations, bridges, foundations and so on.
Q:Is the equipment used in the real estate pile driving machine high or low?
Conventional pile drivers and pile drivers are all plain motors, 380 volts.
Q:How many kinds of pile driver are there?
The cylinder type diesel hammer takes the cylinder as the hammer seat and directly uses the lengthened cylinder to guide the inner wall. The two guiding rods are omitted, and the plunger is a hammer head, which can move up and down in the cylinder. When piling, the pile cap at the bottom of the hammer block is pressed on the top of the pile, lifting the plunger with a hook, and then decoupling and downward impacting to compress the air enclosed in the cylinder. And fuel injection, explosion, shock, ventilation and other work processes. Diesel hammer work is on compression ignition diesel to start, it is necessary to ensure the closed gas cylinder reaches a certain compression ratio, sometimes piling in soft soil layer is often because the reaction is too small, the amount of compression is not sufficient to ignite the ignition, it needs to use the hook to lift a hammer from multiple impact, to start. The hammer seat of the diesel hammer is provided with a fuel injection pump, an oil tank, a cooling water tank and a pile cap. The movable gap between the plunger and the cylinder is sealed with an elastic plunger ring. Four, hydraulic hammer piling machine is a diesel belt start, to the oil pressure as the driving force, can be adjusted according to the formation of different soil pressure, in order to achieve the appropriate impact force for piling, is a new type of pile driver. Small and medium-sized hydraulic pile driver, commonly used in highway guardrail piling, highway guardrail construction. Similar pile driving equipment are: hydraulic pile driver, road pile driver, guardrail, pile driver, road drilling machine.
Q:What is the specific working principle of the 80 type pile driver?
The main principle that piling machine is generally more vibration hammer (this principle is nothing more than the vibrations make the hydraulic tubing sinking) not used but the price too high maintenance trouble this hour how many meters are not counted nor so counted are generally by 10 meters with a 20 meters as a count this time the specific time depends on the formation of me is to do this to give you about what you do this mainly before entering the first to see money does not receive this is mainly engaged in engineering for the most difficult access fee second third of total output value (and you probably under a mechanical maintenance personnel piling machine is very easy to go wrong) the fourth is the very important geological prospecting (some strata such as large pebbles etc.
Q:How to safely operate a pile driver?
Code of practice for safety operation of pile drivers(1) all kinds of pile operators should be trained and tested, and obtain special operation personnel operation certificate, with operation permit operation.(2) the pile shall be vertical and the pile forward shall not exceed 5 degrees, and the back shall not exceed 18 degrees.(3) the angle between the steel wire rope and the guide rod shall not be greater than 30 degrees, and the lifting stake shall be operated according to the operation rules of the lifting operation. It is strictly prohibited to tilt or tilt when lifting precast piles.(4) the hammer of the wire rope should be slightly relaxed after instrumentation, to prevent the hammer lay wire rope, tug, hammer head hook should be locked.(5) diesel hammer pile machine, hoist hammer, hanging pile must use the winch ratchet insurance. Start piling hammer should be opened before the mechanical lock, the hammer claw retracts, starting out before starting the hook, prevent the hammer hanging from the pile top pile accident.
Q:In what type of terrain can the survival machine be used to strike minerals?
Good character on the line, there must be a high mountain mines, coal, iron less.Chasing the answerCopper is also possible
Q:120KW piling machine needs a lot of air?
The general experience of 1 kW 2 amps, so we can use 250A open, because your motor power is relatively large, it is best to use a control box with a starter to safe operation.
Q:How deep can a pile driver work?
The deepest foundation piling machine can hit 20 meters, five or six floors are generally enough, in a special customer service Huilong piling machine three insurance contract, you can personally to visit the company, can also visit the construction site.
Q:I'm from Yunnan, and we have very few pile drivers here.
Yunnan is red soil, soil viscosity is relatively strong, strong choice, pile driving machine, no artificial shovel soil, as long as there is a live three months can earn the cost of piling machine
Q:Rules for operation of impact pile drivers
Two, piling construction process, before piling construction, in the construction site around the axis control network testing and protection, and do a good mark, and transfer procedures. The construction process is as follows: lofting pile two Pile Lofting pile pile on pile machine machine alignment machine to feed the pile piling pile verticality correction electric welding welding cooling design requirements to stop piling pile hammer machine machine three, hammer pile construction technology and quality control measures of each Pile Lofting after two times of review and correct aligned with the pile location insert, the first section is slow into the retaining pile verticality, upper and lower section pile after aligning welding, welding inspection by the parties after natural cooling time to meet the requirements after piling, final penetration and elevation controlled by the supervision, party a visa confirmation after the stop hammer machine construction. (1) the quality of the pile is guaranteed by 1. After each pile comes into play, the pile shall be discharged after passing the qualification evaluation (including the qualification certificate, the pile type, the date of manufacture, the appearance quality, etc.), and the pile shall be stacked in plain and not too high layers.
The company has wide experience and offers a range of equipments, expertise and services to the road marking industry. The products range from road marking equipments, reflective materials, pile driver, traffic signs, traffic barrier as well as undertaking turnkey projects. Our company will be further committed to contributing to the designing, R&D, manufacturing, and providing high quality products, customer care, prompt services as well as strong technical support to both domestic and overseas customers. .

1. Manufacturer Overview

Location Liaoning, China (Mainland)
Year Established 2000
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Mid East
Eastern Asia
Western Europe
Company Certifications ISO:9001:2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 31% - 40%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered
Product Price Range