yuchai YC120R Rotary drilling rig.

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

yuchai YC120R Rotary drilling rig

Technical Specifications

Item

Parameters

Chassis

Engine Model

 

6BT5.9-150

Rated Power/Speed

kW/rpm

112/1950

Outer Width of Crawler

mm

2990

Width of Crawler Plate

mm

600

Hauling Force

kN

198

Power Head

Maximum Torque

kN·m

120

Speed

r/min

8-28

Maximum Pressure

kN

120

Maximum Pulling Force

kN

120

Pressurized Cylinder Stroke

mm

3600

Hoist

Main Hoist

 

 

First Layer of Lifting Force

kN

125

Maximum Lifting Speed

m/min

60

Diameter of Wirerope

mm

D22

Auxiliary Hoist

 

 

First Layer of Lifting Force

kN

50

Maximum Lifting Speed

m/min

65

Diameter of Wirerope

mm

D16

Mast

Rake Angle

5

Left/Right Tilt Angle

±4

Hydraulic Pump

Maximum Pressure

Mpa

34

Hole Depth

Hole Diameter

Maximum Drilling

mm

1500

Maximum Drilling Depth

m

40

Drill Pipe

Drilling Pipe

mm

377

Working Weight

t

35

Keywords:rotary drilling dig,yuchai rotary drilling dig,weichai rotary drilling rig,weichai,chinese rotary drilling rig


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many meters can a small pile driver reach?
1.2 meters in diameter, wylong machinery had sold a small machine
Q:What's the special use of a pile driver?
There are two main types of pile driver used at present: diesel hammer pile driver and long spiral drilling rig.In general, long spiral ring power head motor starting current depends on the specific circumstances, if the full voltage starting with load, the starting current is 5-7 times the rated current of the power supply. The construction of their equipment.
Q:Safety requirements for diesel hammer pile drivers for diesel hammer pile drivers
11 water cooled diesel hammers shall be maintained with sufficient cooling water for continuous work and shall not be used without water. 12 operation, diesel hammer final ten hit penetration should comply with the provisions of the use manual, when every ten hit penetration is less than 20mm, should stop hammering or replace pile hammer. 13 during the piling process, lubrication and repair shall not be performed. 14 when the hammer (pile) of pile driver is used, the minimum distance of hammer (pile) from the top of column shall be ensured. 15 after the pile is inserted, the verticality of the pile should be corrected in time. When the pile is embedded in the 3M, the pile should not be taken for walking or turning to correct it. The 16 batter pile, the vertical pile should be vertical, the pile into fixed, and then began to tilt, tilt 18.5 degrees in the post, should not raise diesel hammer. Track three fulcrum type pile frame in the backward of batter pile, should use the rear leg cylinder; track type pile frame should be increased after the support platform, and clamping rail clamp. 17 when driving, the diesel hammer shall be lowered to the lowest position, and the slope shall be in accordance with the instruction manual. Self propelled pile drivers should be manned by hand. When walking on the ramp, the center of gravity should be moved to the top of the ramp. The distance from the pipe type piling machine to the end of the roller tube shall not be less than 1m. 18 during operation, the slewing brake should be slow, and the track type and walking type pile stand shall be turned in the same direction, not more than one week.
Q:Handan steel sheet piling machine a number of how much money
According to the quality450 pile driverHit 9m Larson steel sheet pile about 100300 pile driverTrough steel sheet pile 9m 200-300Reference data: 80 tonsI know the construction data, quasi quasi reference
Q:How to hit a pile of photovoltaic power generation?
another is to cast in the way, the prefabricated pile installation, need to use piling piling machine, if you need to cast it would need to model it, hope to be adopted
Q:How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
About 8 meters per hour, durable, bad, are spare parts, such as wire rope, brake, triangle belt, but do more work, it will earn!
Q:Diesel hammer piling machine principle
Diesel pile hammer body is made of cylinder and plunger, similar to the working principle and the single cylinder two stroke diesel engine into the cylinder combustion under high temperature and high pressure atomized diesel combustion chamber by injection pressure generated by the detonation driven hammer working. According to the structural form of diesel hammer rod and cylinder type separation.
Q:18 how much money piling machine
Depending on how large and deep you hit the pile, the price is from tens of thousands to millions. If the individual investment, you can first inspect the small pile driver.
Q:What machinery is suitable for a PV pile driver?
Are you talking about a small hammer pile driver for excavators? If you are playing a photovoltaic pile (hollow pipe pile) below 9 meters, you can use the north Yi Machinery BY-YH250 model of small hammer piling machine, installed on excavators.
Q:How to use the pile driver?You're right. Contact 18961845125 before you know.
Installation operation procedure editorFirst, piling machine operators must be familiar with the structure of the machine, performance, operation essentials and safety precautions, after passing the test and obtain a certificate, you can operate alone.Two, operators must concentrate on the operation. Do not talk, laugh, play or make trouble with unrelated persons. No smoking or food is allowed during the operation.Three, strictly abide by the relevant provisions of the maintenance of pile drivers, conscientiously do all levels of maintenance, to ensure that pile drivers are often in good condition. And pay attention to the rational use, correct operation.Four, the pile driver in the work should be prepared for the following:1, to the construction staff understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range