Wiring Duct
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 5000000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Detailed Product Description
No slot design, for external wiring or where wire extraction is not necessary.
Material: High impact, self-extinguishing
. | 22X10 | 3~8pcs | 2M | |
. | 30X15 | 10~25pcs | ||
. | 16X16 | 3~10pcs | ||
. | 25X16 | 5~12pcs | ||
. | 38X16 | 12~30pcs | ||
. | 20X20 | 5~12pcs | ||
. | 40X20 | 20~40pcs | ||
. | 15X25 | 5~12pcs | ||
. | 25X25 | 10~25pcs | ||
. | 38X25 | 20~40pcs | ||
. | 50X25 | 25~45pcs | ||
. | 25X30 | 15~25pcs | ||
. | 30X30 | 20~40pcs | ||
. | 100X30 | 130~160pcs | ||
. | 33X33 | 25~45pcs | ||
. | 100X33 | 180~200pcs | ||
38X38 | 45~50pcs | |||
. | 25X40 | 20~25pcs | ||
. | 33X40 | 40~45pcs | ||
. | 40X40 | 60~70pcs | ||
. | 60X40 | 100~115pcs | ||
. | 75X40 | 120~135pcs | ||
. | 80X40 | 120~135pcs | ||
. | 100X40 | 130~175pcs | ||
. | 25X45 | 20~25pcs | ||
. | 33X45 | 40~55pcs | ||
. | 45X45 | 60~70pcs | ||
. | 65X45 | 110~120pcs | ||
. | 25X50 | 20~30pcs | ||
. | 38X50 | 20~35pcs | ||
. | 50X50 | 80~90pcs | ||
. | 75X50 | 180~200pcs | ||
80X50 | 180~200pcs | |||
. | 100X50 | 200~260pcs | ||
. | 25X60 | 40~45pcs | ||
. | 40X60 | 100~115pcs | ||
. | 60X60 | 120~135pcs | ||
. | 80X60 | 180~210pcs | ||
. | 100X60 | 240~290pcs | ||
. | 120X60 | 240~290pcs | ||
. | 72X64 | 200~220pcs | ||
. | 25X65 | 40~45pcs | ||
. | 33X65 | 60~75pcs | ||
. | 45X65 | 110~120pcs | ||
. | 65X65 | 180~200pcs | ||
. | 120X65 | 260~350pcs | ||
. | 25X75 | 50~55pcs | ||
. | 50X75 | 180~200pcs | ||
. | 75X75 | 200~250pcs | ||
. | 100X75 | 260~320pcs | ||
120X75 | 280~380pcs | |||
. | 150X75 | 335~500pcs | ||
. | 25X80 | 60~75pcs | ||
. | 40X80 | 120~135pcs | ||
. | 60X80 | 180~210pcs | ||
. | 80X80 | 240~290pcs | ||
. | 100X80 | 260~350pcs | ||
. | 120X80 | 300~400pcs | ||
. | 33X100 | 180~200pcs | ||
37.5X100 | 180~200pcs | |||
. | 40X100 | 130~175pcs | ||
. | 48X100 | 215~250pcs | ||
50X100 | 210~260pcs | |||
. | 55X100 | 220~260pcs | ||
60X100 | 240~290pcs | |||
. | 70X100 | 250~300pcs | ||
. | 75X100 | 260~300pcs | ||
80X100 | 260~350pcs | |||
. | 100X100 | 300~400pcs | ||
150X100 | 450~600pcs | |||
200X100 | 600~800pcs | |||
200X150 | 1040~1200pcs | |||
200X200 | 1200~1600pcs | |||
300X100 | 1040~1200pcs |
Connectors
MID-WAY
CONNECTOR | SDM-1616 | SD-1616 | 20pcs | |
SDM-2516 | SD-2516 | |||
SDM-3816 | SD-3816 | |||
SDM-4040 | SD-4040 | |||
SDM-5050 | SD-5050 | |||
SDM-7575 | SD-7575 | |||
SDO-1616 | SD-1616 | |||
SDO-2516 | SD-2516 | |||
SDO-3816 | SD-3816 | |||
SDO-4040 | SD-4040 | |||
SDO-5050 | SD-5050 | |||
SDO-7575 | SD-7575 | |||
SDT-1616 | SD-1616 | |||
SDT-2516 | SD-2516 | |||
SDT-3816 | SD-3816 | |||
SDT-4040 | SD-4040 | |||
SDT-5050 | SD-5050 | |||
SDT-7575 | SD-7575 | |||
SDL-1616 | SD-1616 | |||
SDL-2516 | SD-2516 | |||
SDL-3816 | SD-3816 | |||
SDL-4040 | SD-4040 | |||
SDL-5050 | SD-5050 | |||
SDL-7575 | SD-7575 | |||
SDI-1616 | SD-1616 | |||
SDI-2516 | SD-2516 | |||
SDI-3816 | SD-3816 | |||
SDI-4040 | SD-4040 | |||
SDI-5050 | SD-5050 | |||
SDI-7575 | SD-7575 | |||
SDE-1616 | SD-1616 | |||
SDE-2516 | SD-2516 | |||
SDE-3816 | SD-3816 | |||
SDE-4040 | SD-4040 | |||
SDE-5050 | SD-5050 | |||
SDE-7575 | SD-7575 |
- Q: How do I remove the air switch from the electrical guide rail?
- Here's a clip. Take a screwdriver and lever it out and take it down
- Q: How to calculate the length of the elevator rail?
- The length of each rail is fixed, the main rail only 2 kinds of bar, a kind of 3 meters, a 5 meters. If the length of the rail used for the whole well is calculated, it is possible to directly calculate the depth of the well, since the total length of the guideway is only a little above the length of the hoistway. Although I did not calculate much, but I have rowed over, the top of the rail, according to the top of the well road, only less than one arm distance, and this requirement is not very accurate, can only distance from the top of the well, the closer the better, can not be too far.
- Q: How to determine the mounting position of the guide bracket?
- 1, in determining the position of the guide bracket at the same time, but also consider the rail connection plate (link plate) and rail bracket) 1 can collide. Staggered net distance is not less than 30mm. 2, longer than 4m (including 4m) car rails, each should have at least two rail brackets. 4m to 3m long car rail is not subject to this limit, but the guide rail spacing shall not be 2m. If the manufacturer's drawings are required, they shall be constructed according to their requirements. 3, if the drawings are not clearly defined, the lower level rail support is taken as the base point, and every 2000mm is a row of rail brackets. Elsewhere (in case of said plate) spacing can be properly enlarged, but should not be ten 2500mm. 4, there is no elevator rails, brackets, buried iron elevator shaft lining, according to the requirements of the drawing guide bracket spacing, size and installation of the rail support vertical song to determine the guide rail bracket in the wall of the location. 5, when the drawing does not specify the next row guide rail bracket and the top row of the rail bracket position should be determined according to the following provisions: the next row guide bracket is arranged at the position corresponding to the pit decoration above the ground 10001m. The smallest row of racks is installed below the roof of the hoistway, no more than 500 m M.
- Q: SIEMENS PLC rail has 160480530830, four lengths, how to choose? Which is the longest? Is the rail length selected according to the width and quantity of the module? How many modules can be installed in 830? How to quickly select the guide rail?
- 830mm, 10, there's nothing wrong with it
- Q: There is a tall, 3 meters tall, have two elevator masonry filled walls, without beam, high beam 700, now ready in every layer of the upper and lower beams are respectively fixed with a guide rail frame, then the distance between rail frame will be: 500, 2500, 500, 2500, and so on. Is that feasible?
- Look at the situation, if you would like to lift the rails bold, you can.If not, there is no way, it must be changed.If the elevator construction there's maximum distance of not more than 2500, this sentence is no problem.But you need to speak up with the elevator company because the number of rail racks has changed. If the number of layers is higher, the number of rail brackets will increase more, and then affect the installation.
- Q: The difference between guide rail and slide rail
- The linear guide rail is a general designation, including slider and track. The linear guide rail is also called the straight line slide rail, the linear slide rail, the linear guide rail, the guide rail, the slide rail, actually refers to is the same thing. Generally speaking, linear guide refers to square track, a guide rail two or four track Cao, of course some of the linear bearing and the optical axis is called linear guide, or circular orbit.
- Q: What is the maximum length of a linear motor that can drive a guide? I want to do an automatic feeding device
- The linear motor divides the stator and the stator, and their length can be extended by splicing the stator and the stator, so that the length of the guide rail can be infinitely long, and the length of the guide rail is not limited.
- Q: 45 steel material made of rail wear is particularly fierce, how to deal with the effect will be better?
- Do conditioning, it will certainly be better
- Q: The mechanical guideway acts as a guide Then why are they called rail pairs? What does "deputy" mean?
- The utility model has the meaning of a quantifier, and the pair has the meaning of a quantifier. The guide rail pair is a guide rail and a slide block on the top to form a guide rail system... The movement pair is movement
- Q: What mechanical equipment will use linear guide rail, if I machine equipment, not a general industry, I hope you will give some answers
- Semi automatic cutting machine runway must be straightThere is also the gantry crane rails are straight latheOh, there are lifts for construction sites, and some guides
We believe in the purchasing policy of "try our best to bring your cost down". If you plan to purchase goods to reduce your cost, please let us have a chance to quote at your needs. We are capable of providing you with a profitable proposal with assurance.Hope we can build long-term and good business relationship.
1. Manufacturer Overview
Location | Zhejiang,China |
Year Established | 2010 |
Annual Output Value | US$5 Million - US$10 Million |
Main Markets | North America 9.41 South America 5.88% Eastern Europe 10.59% Southeast Asia 4.29% Africa 6.06% Oceania 5.88% Mid East 4.88% Eastern Asia 5.12% Western Europe 8.24% Central America 5.06% Northern Europe 12.94% Southern Europe 7.94% South Asia 10.18% Domestic Market 3.53% |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Sydney,Angeles,Singapore |
Export Percentage | 61% - 70% |
No.of Employees in Trade Department | Above 50 People |
Language Spoken: | English, Chinese, Spanish, Russian |
b) Factory Information | |
Factory Size: | Below 1,000 square meters |
No. of Production Lines | 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | High and/or Average |
Send your message to us
Wiring Duct
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 5000000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords