Solid Cable Duct

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
500 Meters m
Supply Capability:
300 Tons per Month m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

cable duct , CE,make of rigidity PVC

 

sale well in Southeast Asia, Mid Asia,Eastern Europe,Iran,Indonesia,Pakistan.

 

Item.NO.

Wx H (mm)

Item.NO.

Wx H (mm)

 

PZC-1010

10x10

PZC-5025

50x25

PZC-1510

15x10

PZC-5050

50x50

PZC-1212

12x12

PZC-6040

60x40

PZC-1616

16x16

PZC-6060

60x60

PZC-2010

20x10

PZC-7550

75x50

PZC-2313

23x13

PZC-7575

75x75

PZC-2414

24x14

PZC-8050

80x50

PZC-2516

25x16

PZC-8060

80x60

PZC-2525

25x25

PZC-10040

100x40

PZC-3015

30x15

PZC-10050

100x50

PZC-3816

38x16

PZC-10060

100x60

PZC-3818

38x18

PZC-10075

100x75

PZC-3919

39x13

PZC-100100

100x100

PZC-4025

40x25

PZC-150100

150x100

PZC-4040

40x40

PZC-200100

200X100

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What can go to the top of the geothermal tube?
45 degrees or 135 degrees. Mainly this angle is most suitable for elbow. Less than 45 degrees, will make the climbing longer; greater than 45 degrees, the cable is not easy to bend, making the cable can not keep the bottom of the tank.
Q:Low voltage power cable telemetry insulation resistance, the number should be used to shake the table? The
Three-phase insulated wire yellow, green and red Respectively, that the AC voltage of the A, B, C three-phase 220V mains line is the line of fire in general with red or brown, because the two colors are hot
Q:Win8 system plug the video line why insert the audio line is not sound
. the specific accounting entries are: by: management fees - other loans: bank deposits . the management fee subjects include: company funds, staff education funding, business, the company's financial management, Duties, taxes, technology transfer fees, amortization of intangible assets, consulting fees, litigation costs, amortization of start-up expenses, surrender of higher management fees, labor insurance premiums, unemployment insurance premiums, board expenses, financial audit fees, during the construction period Start-up costs and other management fees.
Q:Ipad not charge how the matter. Said the cable or accessories have not been certified, and may not be able to cooperate with this ipad reliable work.
Right-selectnets, and then select the whole board box, or select the network you want to change the line width and then right -Properties ..., in the pop-up Properties dialog box you can fill in the line width value, it is possible to change the line width Will be violated, resulting in changes to failure, this time, you can press DRO no model command to prohibit the rules, and then modify the
Q:TV background wall of the wire, how do we deal with?
E with thinning, C deep application, SR along the cable laying, CT cable bridge laying, K with porcelain or magnetic beads laying, PCL with plastic card laying, SC with welded steel pipe laying, TC with wire laying, PC with hard plastic Tube laying, FPC with semi-rigid plastic pipe laying, CP with the snake leather laying, PL with porcelain plywood laying,
Q:Open a small company ready to do integrated wiring monitoring and computer maintenance please help me look at the pre-stocking what needs to be improved!
YJV-4 * 240 + 1 * 120 Theoretical Outer Diameter: 54.7mm; YJV-4 * 50 + 1 * 25 Theoretical Outer Diameter: 28.2mm.
Q:Dark tube does not have any good way to resolutely?
1 To the hardware store to buy two 18 # thin wire, the length of the wire tube to the other end of the distance, plus 2 meters
Q:JMC treasure pickup truck morning cold start difficult (other times can be about the name), ask the car master to the point of view
So long ah, give you that 5V is the voltage, many people only look at this, there is a call is the current, this is the key, because the voltage how you branch, are 5V, but the current will slowly weaken, You should go to a USBHUB with an external power supply, but also to clearly see the current marked as 2A, so you put the extension cord inserted in it, then plug it into the computer above, you can have such a situation, often Get a USBHUB, no external power supply, and then consequently to the above, the results do not move, with you this is the same, the voltage does not matter.
Q:I want to buy a desktop computer. Spend about 3000, mainly used to play games, cartography, please help me out of a configuration list, thank you!
3 The pipe diameter should not be less than 15 times the cable diameter Laying the power cable pipe, the aperture should not be less than 100mm; laying control cable row, the aperture should not be less than 75mm 4 The distance from the top of the underground pipe to the ground should not be less than the following values: 200mm in the plant; 500mm under the pavement; 700mm in the general area 5 The depth of the wellbore should not be less than 18m at the site with a straight line distance of more than 100m and at the turn and branch of the pipe row The depth of the wellbore should not be less than 18m and the diameter of the well should not be less than 07m in order to facilitate the laying and Overhaul 6 Piping to the well shall have an inclination of not less than 01% so that the water in the pipe flows into the well 7 When laying cables in the piping, place the cable tray in the wellhead and wire the wire into the pipe hole to pull the cable into the pipe hole In order to prevent damage to the cable, the discharge port should be set with a smooth trumpet, the pit should be installed pulley, the cable surface can be sprinkled with talcum powder or butter to reduce friction 8 Cable laying in the pipe, can be used to strengthen the lead but no armored bare cable or plastic sheath cable
Q:Indoor wire, go straight line, how fixed? The
The market is dedicated to the clear line of the trunks fixed on the wall and then put the line inside the trough cover can be covered
Our company now has more than 100 employees, over 30 technicians and a professional technology R&D center. At present, our products has been proved up to GBJ15-88"Build water system design specification" standard.We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Guangdong,China
Year Established 2007
Annual Output Value
Main Markets South America
Eastern Europe
Southeast Asia
Africa
Mid East
Eastern Asia
Company Certifications CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 51% - 60%
No.of Employees in Trade Department
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 3,000-5,000 square meters
No. of Production Lines 8
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range