Round Type Wiring Duct
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Meters m
- Supply Capability:
- 20.000 Meters per Day m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Comply with CE,SGS
2.Made fof PVC,2500V insulation and heat-resistingup tp 85 degrees
3.All colors can be made
4.Any size you want
5.Round type wiring duct
6.Combustion proof and Durable
7.tape for permanent stick
Cable Ducts :
Material : PVC
Instruction :made up of duct bottom and lid , with two out-holes designed at the bottom
Usage :Home telephone wires ,DGT Wiring,Disaster Prevention ,burglarproof,Monitoring System the wire
Feature :Sermicircle design of the norch cover makes the product not to stumble the passer when used on floor,also easier to be carried and let the trolley pass
Certificate :CE , ISO9001,SGS
Size:
ITEM NO. | outer width | inner width | outer height | inner height |
K-RTD-2 | 20 | 8 | 6 | 4 |
mm | mm | mm | mm | |
K-RTD-3 | 30 | 11 | 8 | 6 |
mm | mm | mm | mm | |
K-RTD-4 | 40 | 16 | 9.5 | 7 |
mm | mm | mm | mm | |
K-RTD-5 | 50 | 20 | 11 | 8 |
mm | mm | mm | mm | |
K-RTD-6 | 60 | 30 | 13 | 9 |
mm | mm | mm | mm | |
K-RTD-7 | 70 | 40 | 15 | 10 |
mm | mm | mm | mm | |
K-RTD-9 | 90 | 45 | 19 | 15 |
mm | mm | mm | mm | |
K-RTD-120 | 120 | 70 | 25 | 21 |
mm | mm | mm | mm |
- Q: Just finished finishing, the wall trough cracking, very fine cracks
- Free wiring flicker-free, stable and reliable quality of the smart switch to bring customers a better consumer experience The use of mature and stable single fire line technology to take the smart switch has the following characteristics: 1 Single Fire Control, direct replacement of the original wall of ordinary mechanical switch, no need to re-wiring, direct replacement of the traditional 86 switch, no need to connect another line, no need to change Lamps and lanterns can be remotely controlled, no impact on each other, the installation is simple, fast and safe; 2 Ultra low standby power consumption, standby flicker when the lamp phenomenon; 3 Significantly compatible with commonly used lighting (such as LED lights, Energy-saving lamps, fluorescent lamps, incandescent lamps, fluorescent lamps, tungsten filament lamps, etc), no external reflex capacitors and other accessories; 4 Using multi-channel power supply technology, standby power consumption is smaller, and power supply regardless of primary and effective There is a way to damage the lamp and lead to the entire switch products can not use the situation;
- Q: Hello, ask, in the home of the lighting circuit, the bus, the main line, socket line, light line, can walk in the same trunking?
- So long ah, give you that 5V is the voltage, many people only look at this, there is a call is the current, this is the key, because the voltage how you branch, are 5V, but the current will slowly weaken, You should go to a USBHUB with an external power supply, but also to clearly see the current marked as 2A, so you put the extension cord inserted in it, then plug it into the computer above, you can have such a situation, often Get a USBHUB, no external power supply, and then consequently to the above, the results do not move, with you this is the same, the voltage does not matter.
- Q: I would like to ask you! The current type of PVC pipe corresponding to the general can put a few cable ah! Make an example of 20 PVC pipe can put 2-3 cable! Please list me out from 20-100! Thank you! If satisfied, then I can add points! If the detailed point, such as the general trunking and arc trunking, metal trunking, etc. to elaborate! I give you 100 points! Question added: I am doing integrated wiring! Novice! Is to pull the cable! 8 network cable about how much PVC pipe or PVC trunking ah! The above detailed list if someone listed me add 100 points to you! More
- Thermal expansion and contraction. So the summer set up the wire, to set aside enough margin, so as not to shrink in winter when the cable or pull the wire or pull the poles. Field of the wire, the winter wire is relatively straight, relatively curved in summer Is the physical change of the wire at different seasons. . this is called the installation of wire sag, in the communications sector, the power sector has its own detailed operating procedures, a very detailed form of the provisions. . the vertical design of the wire installation requirements: the maximum temperature in the local environment when the wire is not mixed; in the local minimum environment when the wire continued line. . the vertical line of the wire and the distance between the pole, the greater the distance from the greater the distance; . the vertical and the temperature of the wire, the higher the temperature the greater the sag; . the wire sag and the line material And so on.
- Q: Wall trunking repair program, building friends, have something hurry to teach about, hurry Jijiji Jijiji Jijiji Jijiji
- Need to do fire treatment, such as fire mud is very good, but also to increase the steel mat, electrical acceptance of the specification there is a requirement.
- Q: The two days began to renovate the house, and started with the master of the open slot said not to sideways slotted, but after a day, I went to the house to see when he was taking advantage of I was not in which two The room was sideways opened a about 1.5 meters, 3 to 4 cm deep groove, I heard that sideways after the location of a long time there will be cracks, then I should now how to remedy it? If I give up the two sockets, fill with the cement, which is not the line, and can make up the original did not look like when the slot? Will there be any other serious consequences when there is a crack? More
- E with thinning, C deep application, SR along the cable laying, CT cable bridge laying, K with porcelain or magnetic beads laying, PCL with plastic card laying, SC with welded steel pipe laying, TC with wire laying, PC with hard plastic Tube laying, FPC with semi-rigid plastic pipe laying, CP with the snake leather laying, PL with porcelain plywood laying,
- Q: Who can tell me that the electrical design inside the weak design is how to calculate the weak bridge to it, how to accurately calculate how much capacity should be used in the weak bridge, thank you more
- National standard wire and cable requirements: the minimum value of the minimum value of the maximum diameter ~ the largest number of core countries have a national model models can also be customized according to customer requirements of different core number of different specifications of the cable other provisions: such as tensile pressure test Coal mine cable national standard is: MT818-2009 power cable is: GB / T-2008 Overall, each cable has its fixed standard, after the specific problem specific analysis of it pure hand, hope to adopt
- Q: Electrician hydropower installation problem, the trunnion elbow turn more places every time the right angle is not to draw and then cut the ah? Still feel it?
- Right-selectnets, and then select the whole board box, or select the network you want to change the line width and then right -Properties ..., in the pop-up Properties dialog box you can fill in the line width value, it is possible to change the line width Will be violated, resulting in changes to failure, this time, you can press DRO no model command to prohibit the rules, and then modify the
- Q: H + CMR100 * 100J + AMR100 * 100J + MR100 * 100T + MR100 * 100 above the four codes are what the meaning of MR I know that is the metal trunking, but H + CJJ + AT What is the meaning of it online and so much more urgent
- Mainly look at the use of the environment. Under normal circumstances with ordinary carbon steel on the line. Q235A, then coated with anti-rust paint.
- Q: Due to socket reasons, connected to the computer's signal line connection exposed to the ground, with tape fixed on the tile, not long after the chain, bare out, how better to those bare wire fixed Rao, once and for all? By the way to ask, stick to those tiles on the tape, how to clean the glue faster? More
- Hello (E-5A-4) has been able to cope with the high calorific value of the outstanding performance of the fire, through the UL1709 (ASTME1529) standard large-scale hydrocarbon pool fire test, and China Standard GA / T714-2007 related hydrocarbon fire test
- Q: Fire line slot CT100 * 100 * 1.8 What does it mean?
- There is no specific requirement for the crossing of the power trough, as long as it does not affect the construction and the aesthetics
1. Manufacturer Overview
Location | Zhejiang,China |
Year Established | 1999 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2008 ;SGS |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 41% - 50% |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | Below 1,000 square meters |
No. of Production Lines | |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
Round Type Wiring Duct
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Meters m
- Supply Capability:
- 20.000 Meters per Day m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords