wing nut series/building material 6
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | |||||
Type: | Scaffolding Part Type: | material: | |||
specs: | tensile strength: | percetage elongation: | |||
surface finish: | paking: | payment: | |||
customizable: | MOQ: |
Packaging & Delivery
Packaging Detail: | bags and pallet |
Delivery Detail: | 3 days |
Specifications
wing nut series/building material
high quality reasonable price
process: sand casting
surface :electro galvanized
wing nut series/building material
formwork wing nut, tie rod wing nut
product mechnical properties:
Castings of superior quality produced from electric furnace instead of cupola furnace
most suppliers use,thus ensure the homogeneity and stability of the composition and
reduce the casting defects to minimum.all material properties including composition,
tensile/yield strength,elongation conform to the Chinese Standard GB QT450-10 (DIN
GGG450/NF FGS450-10).
Material: ductile Iron QT450-10
Process: sand casting
Tensile Strength: ≥450Mpa
Percentage Elongation: ≥10%
Surface Finish: electro galvanized
Packing: Bags and Pallet
payment: 30% in advnce ,balance against the B/L copy
MOQ:1000pcs
- Q:What is the service life of the mobile scaffolding accessories?
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share.
- Q:What is rolling scaffolding?
- well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
- Q:Specification and type of scaffold erection
- 4 the vertical pole of the scaffold, the size of the cross bar according to the specific use of the scaffold to determine the specific circumstances, but shall not exceed the following values:Horizontal vertical rod vertical rod large cross bar small crossbar small cantilever cantilever length 1.5m 1.2m 2.0m 1.5m 0.45M5 ramps board, springboard slope is no larger than 1:3, width of not less than 1.5m. 6 wooden rods: wire with 8#
- Q:Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
- (less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
- Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q:Mobile scaffolding accessories prices
- The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
- Q:i just got it like 3 days ago and its no signs of infection and im just worried it might get that way. ive been reading online about people who got infections and people who had all this crap happen. what do i need to do to stop one from coming i mean i use contact solution and cotton swabs wipe it down with wet ones and clean it when i sweat and turn it twice a day.. im always careful about keeping it clean im a neat clean freak but is there anything else i can do to stop infection from coming
- go to safepiercing.org for proper aftercare and what to avoid. if you use store bought saline, make sure it is additive free, but, the sea salt soaks on the above site works much better. also, stop turning it. it disrupts the newly forming skin which prolongs healing and makes you more prone to infection. turning the earring is something that comes from the old way of ear piercing (with a gun). it does not apply to any other piercings, and, we know now that it's not good for any piercing. the 'gun piercers' aren't real piercers and don't know anything about it also, it takes up to a year to heal
- Q:i already found the force in rope 2 but im not getting the force in rope 1.
- difficult situation. search in google or bing. that could actually help!
- Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- To know about College and university! log on to alumne /
- Q:What are the functions and requirements of the masonry wall
- 6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
wing nut series/building material 6
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords