• wing nut series/building material 5 System 1
wing nut series/building material 5

wing nut series/building material 5

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:
10/12 15/17 20/22
Type:
Scaffolding Parts
Scaffolding Part Type:
tie rod wing nut
material:
QT450-10
specs:
15/17
tensile strength:
above450Mpa
percetage elongation:
above10%
surface finish:
electro galvanized
paking:
bags and pallet
payment:
30% in advance, balance against the B/L copy
customizable:
available
MOQ:
1000 pcs

Packaging & Delivery

Packaging Detail:bags and pallet
Delivery Detail:3 days

Specifications

wing nut series/building material
high quality reasonable price
process: sand casting
surface :electro galvanized

wing nut series/building material

formwork wing nut, tie rod wing nut





product mechnical properties:

Castings of superior quality produced from electric furnace instead of cupola furnace


most suppliers use,thus ensure the homogeneity and stability of the composition and


reduce the casting defects to minimum.all material properties including composition,

tensile/yield strength,elongation conform to the Chinese Standard GB QT450-10 (DIN

GGG450/NF FGS450-10).

Material: ductile Iron QT450-10


Process: sand casting


Tensile Strength: ≥450Mpa


Percentage Elongation: ≥10%


Surface Finish: electro galvanized


Packing: Bags and Pallet


payment: 30% in advnce ,balance against the B/L copy


MOQ:1000pcs


Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q:I want to get a scaffolding piercing, but i just wanna know some information.. past experiences etc. So far i have two lobe piercings on both ears and the pain wasn't too bad, but i've never had a piercing on the upper ear. How much will it cost? (I live in the UK) Just some information i guess (: thanks
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)
Q:would a scaffold piercing look gay on a guy?
No it would probably look good, but it kind of depends what you look like before you get it. If you want it go for it.
Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q:Erection of scaffolding accessories
When the scaffolding height of more than 20m, should be in the scaffolding outside every 4 steps to set a level of reinforcement bar, and even walls should be in a horizontal layer set pieces; set of longitudinal reinforcement bars should be continuous, and the formation of the level of closed loop; on the bottom step lower door frame scaffolding should be sealed in the mouth bar, door frame and should be located on both sides of long rod should adopt sweeping bar; fastener rack pole fastened by. Construction should pay attention to the door frame and accessories should not be mixed with the same hand rack.
Q:What does Scaffolding mean in the educational talk?
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
i heard from people after a year an industrial still hurts and they usually have to take them out
Q:Which kind of scaffolding is the most convenient and time-saving?
4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords