• Tower Crane TC7135 ConstructionEquipment Sale Wholesaler System 1
  • Tower Crane TC7135 ConstructionEquipment Sale Wholesaler System 2
  • Tower Crane TC7135 ConstructionEquipment Sale Wholesaler System 3
  • Tower Crane TC7135 ConstructionEquipment Sale Wholesaler System 4
  • Tower Crane TC7135 ConstructionEquipment Sale Wholesaler System 5
  • Tower Crane TC7135 ConstructionEquipment Sale Wholesaler System 6
Tower Crane TC7135 ConstructionEquipment Sale Wholesaler

Tower Crane TC7135 ConstructionEquipment Sale Wholesaler

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 ConstructionEquipment Sale Wholesaler

Tower Crane TC7135 ConstructionEquipment Sale Wholesaler

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 ConstructionEquipment Sale Wholesaler

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q: i know something is supposed to happen when you make a thousand origami cranes but i dint remember what happens. can someone please help me
It's a story about a japanese girl who was diagnosed with leukemia. The story goes, if are diagnosed with leukemia and are able to fold a 1000 paper cranes before you die, you will live. This theory actually works the way horoscopes do. It's not that the making of paper cranes makes you healthy, it has to do with the amount of time it takes. If you survive that long, then you have passed the critical death points and will live anyway, whether you make a thousand of them or not. Plus, it gives you something to do a a healthy, short-term reason to live, which always helps the healing process anyway.
Q: Please help me on this question, I can't seem to find it anywhere on the internet! :(
No animals depend on Siberian crane but they are a source of food to carnivores in the wild.They are usually secondary source because there are mroe source of food that carnivores could eat.SO if they are extinct,it would not be a problem...its only destroying natures beauty!
Q: Hi guys, I am doing a project for school on blue cranes, and i can't find much on what their diet is like? Does anyone know?
What Do Blue Cranes Eat
Q: For those of you who know about the tradition where you make origami cranes and can make a wish, is it 999 cranes or 1,000 cranes? Cuz I just finished making 999, but I'm not sure if it's actually supposed to be a thousand instead.
It is susposed to be 1000 cranes. You string them in 10 sets of 10 cranes. [thats how I remember!]Can you send me your way of folding them? I can't find one that works right for me, they always turn out a little wrong. :[
Q: I know you need to put current around the magnet (or certain type of metal) in order to attract but is it possible to use as pushing an object away. if there is please tell me how!
To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
Q: Are Crane Flies Venomous?
Crane flies are non-venomous and non-biting .It is a common myth that the daddy long-legs would be the most poisonous animal if only it knew how to use its poison, but this is false. There are 300 species in Britain with the commonest being the entirely harmless, if annoying, Tipula Paludosa. They are completely harmless and only live for around three days as adults.
Q: in the karate kid 1984 is the crane kick something they just put in the movie and not real ?
The Crane kick is an actual Martial Arts move it is done in some Hung Ga Kung Fu forms but differently than the one in the movie because it is done without jumping and is much faster the crane kick in the Karate Kid is just a figment of the director and screen writers imaginations.
Q: What are equations /formulas that use to calculate maximum vertical load values, the maximum length of boom?
Hello, Briefly, the structure of the crane or lifting mechanism is not usually the limiting case. The limiting case is to ensure that the Center of Gravity of the mobile crane with the load is such that it is bound within the tires or footprint of the crane. If this load is outside the footprint, the crane tips over.
Q: A crew built this huge crane to build an office building next to my house.... There is a huge flag hanging from the top of it.... Why does the construction company do this???
Wind becomes an issue when lifting large loads with a crane that has a long boom. On some large cranes you may see an anemometer near the end of the crane's boom. The crane operator will usually not make certain heavy lifts if the wind speed is too high. If the crane does not have an anemometer, they may be using a flag to tell them the direction of the wind and to give them a rough estimate of wind's speed.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords