Tower Crane TC6024 Construction Equipment Building Machinery Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Construction Equipment Building Machinery  Sales


\Tower Crane TC6024 Construction Equipment Building Machinery  Sales\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Construction Equipment Building Machinery  Sales

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do crane operators take a bathroom break?!?
They relieve themselves the same way that truck drivers do. That's why you see so many plastic milk bottles along side the high ways. Gotta keep rolling!!
Q:what is the manfacturing process of crane?
There are so many kinds of cranes that you need to pick one to get any kind of good answer - the tall T shaped cranes are simply welded up from tubing and barstock into modular sections that will fit on a semi trailer and be hauled to the site. Their structure shows in the photos. A boom crane with telescoping boom has to be made up of welded tube sections with bearings and hydraulic pistons inside and out. And of course, the base of a moveable crane adds a whole series of complications.
Q:What is the meaning of two flying cranes?
This is an old Russian tradition of painting cranes on laquered boxes like the icon paintings. Many different towns would make these type of boxes. Russian legend claims that the city was a home to icon-painters even before the Mongol invasions. At least since the 17th century, Kholui has been a producer of lacquer boxes, plates, and other painted items that this region of Russia is famous for. After the Bolshevik Revolution, icon painting became unpopular and even dangerous. However, Kholui painters kept painting, at this time in secrecy, giving the area a kind of legitimacy in the cultural/artistic world. The style of icon painting in Kholui is particular to this town, and distinctly different from the more widely-known Palekh style of painting. The icon-painters in Kholui use a large amount of green hues, as opposed to the style of using mostly red colors, as is traditional in Palekh. The Ivanovo Oblast is home to the cities of Putchezh and Kholui. It is found in the center of the Eastern European Plain, and is part of the Central Economic Area of Russia.
Q:in the Open Boat by Stephen Crane, in part IV why are the characters not identified?
The characters are defined by their roles on the boat. Their previous experiences or personalities don't matter here. It is just the narrow repetitive experience of rowing and how they each contribute to it. Each character is Everyman, being thrown around by the merciless, indifferent hand of Fate. I think that Crane was squarely in the company of Naturalists (they think there's no such thing as individual agency, like Darwinism in fiction). The interesting thing to think about here is that one character has a name - Billie, the oiler. Why is this? He's the strongest, he's the most experienced and he's the one that dies. He's an individual to the reader but Fate doesn't care. I'm sure you can flesh the ideas out now.
Q:What happened between Fancy and Pretty Crane on Passions?
i really want to know but they have not said yet. and i am a daily passions watcher :] record it every day !
Q:How were Churches and really tall buildings constructed hundreds of years ago before the invention of cranes?
Cranes existed in Roman times. Before that, you just hauled stuff up with ropes as best you could.
Q:Protective earthing resistance of tower crane
Q:What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:What are the common problems encountered in hiring cranes for house constructions?
Access, I assume you need a Franna. Possibly for frames and or trusses to the second level or steel beams. You will be limited by reach if the crane can only access the front of the house. In which case you may need a slew crane 30t or larger. Know the weights of what has to be lifted and the distance from the crane to where it will be placed. A crane cannot set up or travel over underground services or recently filled excavation. These things could mean the crane has to set up even further away from the house. If the crane is for unloading trucks, access again. Cranes need to stay about 3meters from power lines which is a common problem bringing gear onto site. While a slew crane generally sets up in one position for all lifts (some can travel) a Franna is designed specifically for pick and carry. It can unload trucks and travel the gear onto site under the power lines. Provided it isn't lifting extra large items. Speak with the provider about what has to be done, it will be all to familiar for any decent company. As long as access is fine and underground services won't hinder you they should know exactly what you need. Be prepared, usually a minimum 4hr hire. If you think the task is going to take longer you need to plan what has to be done and have everything ready for placement. Organization is paramount, you don't want a crane and it's crew sitting there doing nothing because you didn't plan ahead. Hope this helps, I could have been more specific if the question had some details.
Q:I'm looking for a quick-release crane hook. ?
We manufacture a QUICK RELEASE FOR CRANE look at www.craneequipment.ca

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range