• Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor System 1
  • Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor System 2
  • Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor System 3
  • Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor System 4
  • Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor System 5
  • Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor System 6
Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor

Tower Crane TC5610 Sales Construction Equipment Building Machinery Distributor

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC5610 Description:

1.CMAX Tower Crane TC5610  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5610  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5610  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5610  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5610  Parameter:

 Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 41.5

Max height with attachment (m) 141.5

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1


Tower Crane TC5610   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5610 Diagram:

Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor

Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor

Tower Crane TC5610 Technical Sheet:

Tower Crane TC5610  Sales Construction Equipment Building Machinery Distributor

Tower Crane TC5610 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:I don't like the cranes that use a wired pulley systems for controlling the camera.The crane will need to carry a 7 pound camcorder.
Camera okorder /
Q:What kind of flower is the Sunset Crane?
Okay, i'm going to get every backyard gardener east of denver jumping down my throat on this one, but it's time you all wake up and know the real name of one of your favorate potted plants. only then will you beleave me when i tell you the sunset crane is a type of geranium. the true geranium. not the plant most people know as the geranium is botanically Pelargonium. that silly looking, red flowered, fuzzy leafed thing everyone loves to stick in a pot by their front door every summer back east and mistakenly call a geranium is not really a geranium. even the fancy Martha Washington geranium is not a geranium. it is the Martha Washington Pelargonium. but whats the use? unless you are a botanist everybody back east is going to say i'm just another fruit cake from california. (born and raised in wisconsin i'd like to add) okay, your sunset crane is botanically a geranium, often called by it's common name cranesbill. okay, you have the real best answer, so go ahead and pick the wrong best answer from some smuck from back east who knows best. sure i have two post graduate degrees in science, been a univ certified master gardener for over 15 years and just might know a tad bit more then the eastern fair weather, summer time gardener. but don't let that prevent you from thinking i'm nuts and choosing a better, best answer. i'm used to it. grandma is always right... until her plant dies. then they call me for the real low down.
Q:What does the crane mean to the Korean people?
Long Life
Q:I have seen a crane sitting in a tree watching over the pond in my front yard. I have never seen any fish in the pond and so i am curious as to why the crane is there. I thought cranes only hangout by ponds if there are fish. Does anyone have an research hypotheses to why the crane is there?thanks in advance
They also eat bugs and little critters. It could have been looking just outside of the pond, also it could have not known there weren't any fish and thought to give it a try anyhow.
Q:For example, self lifting tower crane mounted to 10 meters or 2 floor use. How do you install the third floor now? Is it necessary to remove the crane?. Then add the length of the steel frame on the base seat, and then install the crane above him If so, then 2 cranes are needed. But how is another crane installed?Ask you experts on the construction site of self lifting tower cranes how to install?. Do you use hydraulic jacks like car jacks?
1, since it is self lifting, as the name suggests, is to rely on their own strength, without other cranes can rise.2, it has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the.3 crane refers to a certain range of vertical lifting and horizontal moving heavy lifting machines. Also called crane. At present the Guangdong SHUNFA hoisting lifting equipment limited company has gradually cancelled lifting driving function. The main features are: the tyre crane driving cab and lifting control room, is be made one crawler crane (crawler crane) evolved, the walking tracks and walking mechanism to support part of the tire chassis, overcome the crawler crane (crane) damage caused by the defects of trackboard pavement, belongs to the material handling machinery. Lifting equipment is characterized by intermittent exercise to do some work, namely the corresponding mechanism, taking in a working cycle of transport and unloading action is the turn of the job, the crane in the market development and the use of more and more widely. Because no leg lifting and lifting driving often appear some accident, driving faster than the crawler crane (crane); stable operation, large lifting capacity, lifting, walking road, but must ensure smooth solid tire pressure to meet the requirements, hanging from the ground not more than 50CM in a certain range is prohibited; with a load of long distance. In order to ensure the safety of operation, the lifting operations are not allowed to be carried out at home.
Q:I need the answer badly
The world would be a little less beautiful. The blue crane's role as a predator in its ecosystem would be left empty, allowing its former prey to breed without check until (hopefully) another predator moves in to pick up the slack. Otherwise the ecosystem will be out of balance.
Q:I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
If you download the simulation called Eyes on the Solar System from NASA, you can watch the sky crane crash somewhere off in the distance in the same crater that Curiosity is in. It had quite a bit more reserve fuel than they expected so it might have flown further than shown. edit: they might have disabled that simulation now. I can't get it to work.
Q:Tower cranes should stop working when the wind speed is greater than the magnitude.
Tower crane work is strictly prohibited at grade 4 or above
Q:total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
About 4200 AH( TOTAL) is required with 12 V batteries.
Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords