Tower Crane TC5610 Construction Equipment Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5610 Description:

1.CMAX Tower Crane TC5610  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5610  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5610  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5610  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5610  Parameter:

 Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 41.5

Max height with attachment (m) 141.5

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1


Tower Crane TC5610   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5610 Diagram:

Tower Crane TC5610 Construction Equipment Wholesaler

Tower Crane TC5610 Construction Equipment Wholesaler

Tower Crane TC5610 Technical Sheet:

Tower Crane TC5610 Construction Equipment Wholesaler

Tower Crane TC5610 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why are crane flies called mosquito eaters?
That name and others are colloquial usage. Crane fly larvae will incidentally eat mosquito larvae if it is available to them.
Q:Can the attached arm of the tower crane be welded?
The following points: the calculation of tower crane according to the instructions provided with the attachment of the building, a maximum load attachment device (Fig. 14-44), therefore, should be in the way of adhering bar load as the design or check attached bar section basis.
Q:How's electricity delivered to Overhead Cranes?
Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
Q:Reason why some contruction cranes/wrecking ball cranes use tires.?
Shock absorption. The ball swings toward the building and hits, the energy of that swing is mostly dissipated into the building but also into the cable and cable connectors as the ball bounces back. That shock of the impact resonates and gets dissipated by the tire. It reduces wear and tear on the cable and cable connectors, also on the crane tower. Your car engine has motor mounts of the rubber type of material and it absorbs the resonating vibration of the engine. I have seen the cable connectors, interesting to say the least. The strands are interlaced sometime, and other times I see them clamped together. It would seem important to protect those joints. I do not know all of the crane business terminology, but that would be the gist of it.
Q:What is Whooping Crane in French?
grue de huée
Q:Paper Crane tattoo design issues?
Hey okorder.com/ I reckon the Japanese tradition would really suit this style because of the crane is a Japanese form of art. I do give you permission to print out this piece and work with it as this is only a basic sketch and ive stuffed up a lot of the detail as I forgot it would be easier for you with just an outline also the top flower may need re-doing. I hoped I helped.
Q:A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The?
The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
Q:Who is responsible for the construction of the pile foundation of the tower crane?
According to the present list of quotations, the winning project, the tower crane cost has been included in the total price, and has nothing to do with the construction side, that is, the cost of tower crane foundation should be borne by the construction side.
Q:Which war is Stephen Crane referring to in his poem War is Kind?
Crane was a war correspondent, and had reported on both the Greco-Turkish and the Spanish-American wars. I am surprised you are so sure this poem isn't about the Spanish-American war; I suspect it is about war in general - certainly including the two wars Crane had seen most copiously.
Q:Collapsing Cranes..?
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range