Tower crane STC3611 for building construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TRUEMAX was established in 2003 at Hangzhou, China. In the past 10 years, TRUEMAX has established over 10 manufacturing base, to offer the one-stop services in construction machinery filed, including R&D, designing, manufacturing, quality control and delivery.
With core principle of “True to Quality, Ture to Customer”, our product has been exported to more than 100 countries with high customer appreciation & brand popularity.
TRUEMAX provide the full series of construction machinery and one-stop overall solution. Our product range covers pre-fabrication including aggregate crushing, dedusting and block making; concrete series including mixing, batching, pumping & placing; construction series, such as tower crane, building hoist, suspension platform and lifting basket; light construction machinery, including compacting, cutting, surface finishing machines & rebar processing machines.
Especially the concrete placing boom, we’re the No. 1 in term of products variety, with top quality placing boom of placing radius ranging from 10 meters to 51 meters over 10 different series, the excellent quality & performance has been tested & approved by being used in lots of world famous high buildings.
The manufacturing base of TRUEMAX adopts 6S management system. Quality control system are implemented strictly in the whole procedures, including components purchasing, fabricating and manufacturing, packing and dispatch pre-inspection, ensuring the perfect quality assurance for all of our products. With international certificates like ISO9001:2008, CE & SGS, TRUEMAX guarantee the international first-class level for all of our products.
At present, TRUEMAX is the“Grade A Export Enterprise of China Customs”, “Famous Export Brand of Zhejiang”, “ Famous Export Brand of Hangzhou”, “High & New Technology Enterprise of Hangzhou”, “Top 100 innovation-type foreign trade enterprise of Hangzhou”&“ Key enterprises of Xiacheng district, Hangzhou”, with support from Zhejiang Public Foreign Trade Service Platforms consecutively in 2012 and 2013.
“Quality achieves outstanding success, innovation leads the bright future”, our working principle has leads the rapid expansion of TRUEMAX, with branches and spare parts distribution centers established oversea step by step. We’re targeting to complete the global layout of TRUEMAX Agent within next 2 years, and “TRUEMAX 6S” stores within 5years.
In the coming days, TRUMAX will continue to forge ahead, make our best efforts to create the best platform for career performance, as well as to realize the maximized mutual benefit with all TUREMAX friends, partners, agents & clients.
“View Broad, Ambitions Boundless”, at a new height, we wish to join hands with all the ambitious friends together, contributing to the consummation of the first-class quality construction machinery industry, and creating the new glory constantly.
- Q: i have a 83 camaro crane cam 305 v 8 4brrl edelbrock carb and i just changed the carb from a quadrajet to the edelbrock....but i cant seam to get it running right as long as im out on the highway it runs great but when i stop at a stop light i have to rev it up to keep it running..i changed the plugs plug wires and the distributor but i heard you have to have a different kind of distributor to change from the quareajet ( will all of the plug in and stuff to a regular edelbrock carb..is this true??
- Yes. You need a pre-computer distributor with a vacuum advance on it. The quadrajet had a TPS sensor on it. The Edelbrock doesn't. I would think it would idle though. Sounds like you have a vacuum leak or it's not adjusted right.
- Q: Synopsis for the poem Lost Dances Of Cranes?
- If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
- Q: A lot of condos and hotels are being build in hawaii, and each time i drive pass them i wonder how they are assembled.Since each individual piece looks heavy/sturdy and is 45 stories+ high, how do construction workers put them together. Do they assemble it by hand? Or are smaller cranes needed to do the job? Or possibly a different way i didn't mention?
- Read the guy above me his answer is awesome but choose me for your best answer ok
- Q: is there something that i can add to my bug zapper to attract these bugs and kill them faster?
- Crane flies are concidered mild turf pests in some place, but they don't bite people. They like prefer moist areas. So if you want to kill them you could get rid of small moist areas or also could try normal bug spray on them.
- Q: Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
- Probably just harvest man or a cellar spider making a web. You might have just mistaken them.
- Q: They;re ENORMOUS!!! Do they take them apart or something?
- They are broken down into smaller unit pieces and are transported by truck or rail.
- Q: What are the impacts of construction cranes on the human society?
- construction cranes enabled the building of multiple story buildings which fostered urbanism. It changed the village oriented way of life in America, for good and bad. We became more boadly oriented in our business ventures which increased the stanting of the U.S. in world affairs, but it decreased the degree of brotherhood people felt for each other as they left their roots and dwelt amongst relative strangers.
- Q: I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
- The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
- Q: Hi,what are crane swivels and fishing swivels. are they same
- Yes okorder /
- Q: the part of the crane which balances the lifting arm.
- What okorder /... Always wanted to see one erect itself, they just seem to spring up overnight. Wingman
Send your message to us
Tower crane STC3611 for building construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords