• Tower Crane Split in row of weight 2012 hot QTZ50A(4810) System 1
  • Tower Crane Split in row of weight 2012 hot QTZ50A(4810) System 2
  • Tower Crane Split in row of weight 2012 hot QTZ50A(4810) System 3
Tower Crane Split in row of weight 2012 hot QTZ50A(4810)

Tower Crane Split in row of weight 2012 hot QTZ50A(4810)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

2012 hot QTZ50A(4810) Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity: 6T

Rated Lifting Moment: 160MT    Max. Lifting Load:6T

Max. Lifting Height:120M           Span: 50M 

Model Number: 2012 hot QTZ50A(4810)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

2012 hot QTZ50A(4810)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary,Travelling, external,internal climbing tower crane 

4. Impeller blasting,rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

2012 hot QTZ50A(4810) Specification

Tower Crane Split in row of weight 2012 hot QTZ50A(4810)

2012 hot QTZ50A(4810)  Pictures

Tower Crane Split in row of weight 2012 hot QTZ50A(4810)


Tower Crane Split in row of weight 2012 hot QTZ50A(4810)

Tower Crane Split in row of weight 2012 hot QTZ50A(4810)


2012 hot QTZ50A(4810) FAQ

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is the building hoist main purpose?

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.





Q: Hey i need to know what icabod crane did in sleepy hollow the tim burton version with johnny depp.. so far all i have is In the movie he is a detective or a constable, someone who tries to solve crimes. He stands up for what he believes in even though no one might stand up with him. He used instruments of his own kind. Any information will help..Thank you very much Thx again
He was an Inspector from New York, I think, and he solved the crime in the nick of time. It was the wicked stepmother!
Q: Many schools I visited claim to teach styles like white crane and even Okinawa/Japanese Karate has come from white crane styles, however I seldom see techniques, kata, forms, or drills that encompass crane concepts of even crane movements. Why is that? At some traditional schools kung-fu/karate it is easy to see the animal influence but at others there is none. Does this also indicate a lack of understanding or incomplete training. What do you think.
Maybe you only got to see the very basics of the styles you observed. Our Kata has crane Rohai, Chinto and Gojushiho especially but they are black belt Kata that even the mudansha (colored ranks) in my school very rarely get to see, let alone outsiders who just come in once to observe a class.
Q: why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
Q: What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
i know this big organisation in Japan and some of my frineds live there... if you are interested, I can give you the address and more details...etc
Q: If so, what time of year?
Possibly, these creatures seem to be found all over the world. But why worry about them, they are harmless and don't bite humans - in fact they don't bite anything.
Q: how can we minimize energy losses of a crane to reduce the impact on the environment?
No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
Q: Hi, considering joining a fujian white crane kung fu club, just looking for information on the internet. need videos and photos and descriptions about it. any links? thanks!
My kind of question! I would like to start off by saying that if you have a Fujian WC school near you, you are very fortunate! I have to travel a bit and worst, wait for Sifu to be available. He is always abroad and busy when home. I learn Yong Chun White Crane. I have practiced Okinawan martial arts all my life and WC is the ancestor of my art, or rather, one of them. What school will you be joining? And Paul, what school do you train in? I also love the Hakka arts, which are somewhat related. FWC is an internal art based on Sam Chien training - Sanchin. It's great to know of others who are interested in White Crane Fist. Lets keep this conversation going!
Q: as the crane cabin temprature is very high which is not good for equipment pls advise which air condition is good for colling
confident. Ships use a complicated gadget of chilled water loops, fan rooms and ducts. additionally some areas have further fan coil instruments to maintain cool. while it truly is all working astonishing, it truly is comfortable. in specific circumstances while the sea water temperature is extremely heat and the climate is blistering warm the gadget struggles to maintain up and it gets extraordinarily heat. different areas on the deliver are only infamous for being warm. areas close to the steam catapults on companies, the scullery the place dishes are washed, and a few engineering areas are only constantly freakin' warm. In those areas the warmth rigidity stages are monitored and there are set sessions for how long you could competently paintings in that area.
Q: There are a range of cranes to be selected for a particular type of job. Please provide any suitable method so that we narrow down our selection criteria .
What is the load weight? How high is the lift? Obstruction, possibly needing a jib? If you are placing a load onto a roof, how far from the edge of the roof is the load going to be placed? How far from the crane pivot is the load on the ground and how far are you going to to move the load away from the crane to place it in position? How close can you get the crane to the load and to the load placement site. The usual scenario is to call a crane outfit and they will ask you these questions over the phone or come to the site and discuss the lift with you. A crane is rated for maximum lift as close, usually 10 feet,to the cab pivot center. As the distance increases, the maximum load that can be lifted, decreases. Our 15 ton crane can pick 15 tons/ 30,000 pounds at 10 feet from pivot center. With the boom fully extended; the boom is 100 feet, at a 30 degree angle, it can pick up only 5,000 pounds. Inside of every crane cab should be a chart that shows the lift capacity at various boom angles and boom lengths. Also is included is a chart for the Jib, if the crane has one. Wingman
Q: What are the safety devices in a tower crane?
(1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.(3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.(6) lightning protection and anti electromagnetic wave induction device;For the crane whose hinge height is over 50m, the lightning arrester shall be installed according to the actual situation and the electromagnetic interference shall be taken.(7) tower crane shall install limit torque coupling in order to prevent slewing overload.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords