Tower Crane of Jing Kui Model Number QTZ80(5613)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

QTZ80(5613)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 6T

Rated Lifting Moment: 800

Max. Lifting Load: 6T

Max. Lifting Height: 150

Span: 56

Place of Origin: Cocos (Keeling) Islands

Brand Name: JINKUI

Model Number: QTZ80(5613)

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ80(5613)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ80(5613)  Specification

 Tower Crane of Jing Kui Model Number  QTZ80(5613)

QTZ80(5613)  Pictures

 

Tower Crane of Jing Kui Model Number  QTZ80(5613)

Tower Crane of Jing Kui Model Number  QTZ80(5613)

Tower Crane of Jing Kui Model Number  QTZ80(5613)

QTZ80(5613) FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


 

 

 

 


Q:i was wondering
it would be better if you tried it. :P Ive never heard the story but this is actually wishing magick. so I would vote true on it, but i think there are better wishing methods that won't require that much time and won't kill trees. Blessings, Shadow
Q:A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I win about 3 times outta 5. I watch sbongbob too. At the moment, I'm watching Jimmy Nuetron. lol
Q:How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
with other cranes and lift systems. When done, they move on to the next project.
Q:when a tall building is under construction you alwase see cranes on top. well i would like to know 1. how they move them up as the buildung gets taller and 2nd after there done how do they get them down?
They disassemble them
Q:How to crane fly out of your room?
Trap it in a jar and release it outside,they are easy enough to catch. I catch them and feed them to my spiders.
Q:Firstly, I realize that the 1000 paper crane thing is based on faith and not science. I'm not stupid. Secondly, Do the 1000 cranes have to be in the same place? If I send one of my cranes to a friend across the country, would that no longer count as part of my 1000 cranes?If a crane gets destroyed, must I start over or replace that crane?If anyone has any knowledge or link pertaining to the 1000 paper crane myth, please post it. Thank you.
The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......
Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
Depends on the building of course. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.
Q:Pictures, data, manufacturers.
how in the world could you take a tower crane, a huge crane, and mount it on a wall?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request