Tower Crane CMAX TC6024 Construction Machiney

Ref Price:
$139,800.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:
Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.


Features:

1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

5. LVF: Frequency control, variable speed, smoothness and high stability, non-striking.
6. Moment motor, high stability, long working life.
7. SM: Three-speed change pole motor, simple in structure, economical ,fitting.


Specifications:

Tower Crane CMAX TC6024 Construction Machiney

Tower Crane CMAX TC6024 Construction Machiney

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can you use a cymbal stand as a camera jib/crane?
Cymbal okorder.com/
Q:Will Johnathan Crane/ Scarecrow reapper in the thrid batman movie?
The Joker became employed by making use of the particularly some crime businesses to kill the Batman. He used his criminal genius to concoct an tricky plan to stress Batman to bare his identity. this could harm Batman's benefit of anonymity, making it much less complicated to kill him. because it became out, The Joker didn't wish money, he wanted to run Gotham city's criminal underground, Batman and Harvey Dent have been interior the way. interior the Batman comics, the Joker is Batman's arch enemy. Homicidal, and outstanding, he's often finding for a thank you to kill Batman. regardless of if it skill killing innocents or destroying Gotham city interior the technique. For all those at a loss for words approximately Joker robbing banks: He merely robbed the banks that the criminals had their money in. by making use of doing this, he became particular to get their interest. while Gordon and his team cracked down on 'the mobs'' materials, Joker became there to lend guidance by making use of removing all those that have been inflicting the subject concerns. especially Harvey Dent, and Batman, yet in addition the Commissioner, and the decide allowing Dent to prosecute them. continuously a pair of steps previous to maximum, he knew by making use of soliciting for 0.5 of 'the mob's' money, they had be vulnerable sufficient to overhaul. the explanation Batman completes Joker is as a results of the fact Batman is the only guy or woman clever sufficient to make certain by using his plans. for this reason, it quite is mostly a project to defeat Batman, yet not inevitably kill him.
Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechani
Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
Q:1000 paper cranes okay to give?
You string them in combination in order that they nest in combination in a protracted garland, after which fold the garland smartly in a field. It might definitely be ok to ship them--in particular for the period of a excursion for decorations-- despite the fact that the special location you might ship it might differ from location to location. I might additionally advise drawing near the media, your loved ones, peers and colleagues and asking them to sponsor cranes, in order that you're sending cash at the side of your thousand cranes. I'm folding cranes for charity. You can sponsor one for 5 greenbacks. Would do the trick, and it might upload to a symbolic gesture.
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:What is the velocity of the crane given...?
I don't remember ever doing a problem like this, but I will try to solve it. P = W/Δt, P = Fd/Δt P = Fv Force required to lift the 142 kg object; F = 142 * 9.8 F = 1391.6 N Therefore; P = Fv 500 = 1391.6*v v = 0.359 m/s So velocity of the crane is 0.359 m/s. Is that right?
Q:how can I get rid of what looks like small crane flies in my yard and house. they seem to get in the grass?
First determine if they are hurting anything. If they are true crane flys they will go a way soon. If they are not hurting anything I would not treat them. If you want to identify exactly what they are capture some and take them to you County Extension agent and he/she will be able to tell you what they are and if they pose a danger to you and your family.
Q:How do you build a crane? (it is for a school project)?
Step by step: 1. Get male crane 2. Get female crane 3. Play romantic music 4. Wait 31 days 5. Voila! you have made a crane!
Q:Whooping Crane or Whopping Crane?
Whooping crane, largest bird in North America, named so for its call.
Q:why do siberian crane migrate in india?
The Siberian Cranes nest in western Siberia . During Winter season in Siberia , they migrate to India which is their wintering ground.The migration route stretches for 4000 miles. Their resting place at the time of migration is the Lake Ab-i-Estada in Afghanistan. The Kaladeo Ghana National Park or the Bharatpur National Park has been declared a world heritage site because the Siberian Crane traverses nearly half of the globe to reach it. The Siberian Crane is presently an endangered species. Larger numbers of birds have been hunted down over the years especially when they undertake the perilous journeys across the Himalayas to reach the wet land. They are shot down in Pakistan to be gifted to friends and relatives. This has led to a severe decline in the number of Siberian Cranes in the world. The immediate need of the hour is to provide safety to the Siberian cranes along their migration route. This popular visitor has not been seen in the last two years in India. The last pair of Siberian Cranes which had made the Bharatpur Bird Sanctuary their seasonal home in the year 2002 was not seen in the year 2003. Their absence is indeed painful and one of the aims of the Crane foundation is to bring back the Siberian Crane to India.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range