• CMAX TC6024 Tower Crane Construction Machine System 1
  • CMAX TC6024 Tower Crane Construction Machine System 2
  • CMAX TC6024 Tower Crane Construction Machine System 3
  • CMAX TC6024 Tower Crane Construction Machine System 4
CMAX TC6024 Tower Crane Construction Machine

CMAX TC6024 Tower Crane Construction Machine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
10T
Maximum Lifting Height(M):
200
Rated Loading Capacity:
10T
Span:
60M
Rated Load Moment:
10T

CMAX TC6024 Tower Crane Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.







FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q:I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:How to calculate life span of steel structure? for example, crane?
this type of calculation is a fatigue life calculation, performed (for example) on aircraft. You will have to know the material, the load spectra and the stresses for this load spectra. It is not an easy, nor exact calculation. Try reading some fatigue topics on the reports suggested on the source site.
Q:How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
Renovation of skyscrapers typically uses a crane, if it has one, that is built up the side of the building, resting on the ground but fastened to the frame periodically for bracing. Tower cranes are built in sections and assembled in place with smaller cranes. To a large extent, renovation of skyscrapers is done from the inside - modifying some of the existing elevators, rather than doing anything from the outside, breaking through the walls to get stuff inside.
Q:The war is during 1899, and it's not the Spanish-American war.This isn't assignment, I'm just curious to know.
Crane was a war correspondent, and had reported on both the Greco-Turkish and the Spanish-American wars. I am surprised you are so sure this poem isn't about the Spanish-American war; I suspect it is about war in general - certainly including the two wars Crane had seen most copiously.
Q:In stephen Crane's The Open Boat does the correspondent change from the beginning of the story to the end?
Wow. I haven't read this in years but I loved this shortstory. Yes, the narrator (or corespondent) definitely changes and the nature of this change is made explicit in the closing passages of the story where, if I recall correctly, he says that he feels as if he has become an interpreter of nature.
Q:We would like some ideas from folks who have the cranes coming to their bird feeders. What foods are they attracted to?
Sand Hill Cranes are omnivores which means that they feed on a wide variety of food. Their diet will change depending on the time of year and the habitat. Part of their diet would be rodents, snails, frogs and other small animals. They also will eat the roots of aquatic plants and grains in farm fields. This is where you may be able to draw the cranes to your yard. Spread the bird seed on the ground. Even small piles of seed may help. These birds like to forage through grassy areas and can do some digging with their beaks leaving the ground lumpy, so be sure you want them in your yard.
Q:i was wondering
I read a story if a sick person makes 1000 paper cranes then the gods will grant them a wish but the little girl in the story died so it's hard to tell but she didn't complete her misson www.pacificfriend.ca/html/one_tho... i read the story in school too i almost cried when she died
Q:my father has his forklift and crane license. he needs to know how long they're vaild for
should be good ror 3 years from the date he got it i just got mine new one last month for a sit down fork lift and crane/ trolly and its good till march 2010
Q:Around how much would it be to rent a crane to put a jacuzzi in my backyard.
What the heck do you need a crane for? Is your backyard surrounded by a moat or somthing? Anyways, around $700 an hour, assuming you live in a populated area.
Q:in the karate kid 1984 is the crane kick something they just put in the movie and not real ?
The Crane kick is an actual Martial Arts move it is done in some Hung Ga Kung Fu forms but differently than the one in the movie because it is done without jumping and is much faster the crane kick in the Karate Kid is just a figment of the director and screen writers imaginations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords