• Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China System 1
  • Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China System 2
  • Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China System 3
Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China

Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
6000 pc
Supply Capability:
10000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China

1.Description of Steel Coupler Rebar BS Standard Scaffolding Tube Concrete Wholesales:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China

Steel Coupler Rebar Cuplock Scaffolding System Scaffolding Wheel Made In China

2.Advantages of Steel Coupler Rebar BS Standard Scaffolding Tube Concrete Wholesales: 

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar BS Standard Scaffolding Tube Concrete Wholesales:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide

Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
Q:Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q:THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
First of all, are you working with AC ( alternating current - like a house) or DC ( direct current - like a car)? Assuming you are working with AC, then: Which wire are you holding? This again is assuming 120 vac - Bare copper ( ground) White ( neutral ) or Black ( Hot ) If you have a bare copper ground wire or the White insulated wire you will be fine. If you have the Black insulated wire in your hand then you are going to have a bad day. Yes to the first question Yes to the second question ( I would hope he was smart enough to let go before being too badly zapped) Both is the answer to the third question, as the person is basically an extension of the circuit - being burnt up - until he touches earth (ground) allowing the current to seek ground. All in all I would say leave any exposed wires alone until you have a professional with a multi meter check it out first. If this is in a commercial ( business) setting the voltages are much higher, not to mention it is most likely 3 phase - so watch out. All colors are referenced for the United States.
Q:Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q:does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Q:Hi(: My names Tasha, and I love piercings. (I have 8) And I want to get an industrial piercing(Some call it a scaffold). But my ear doesn't have a bend like most people do.I got my first four piercings done by a professional. But felt I was much more comfortable having my brother(22) do it. Since he's someone I know, and hes done piercings and stuff before.
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
Q:I want to know the classification of scaffolding in the building
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. ScaffoldingBowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords