• Short Fiber Nonwoven Geotextile System 1
  • Short Fiber Nonwoven Geotextile System 2
  • Short Fiber Nonwoven Geotextile System 3
Short Fiber Nonwoven Geotextile

Short Fiber Nonwoven Geotextile

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

made of polyester or polypropylene fiber
good burying, hydrolyzation & corrosion resistibility

Density

Thickness

Breaking Strength

Elongation of Fracture

CBR Bursting Strength

Vertical Penetration Parameter

Equivalent Aperture

g/m2

mm

KN/m

%

KN

cm/s

O95 mm

65

1.2

2.8

40 ~ 80

0.7

K x (10-1 ~ 10-3)

(K = 1.0 ~ 9.9)

0.07 ~ 0.2

75

1.4

3.3

0.8

100

1.6

5.0

0.95

150

1.52

7.5

1.5

160

2.0

8.5

1.60

200

2.4

11

2.10

250

2.8

14

2.60

300

3.4

16

3.20

400

4.0

21

4.0

500

4.5

25

4.8


Q:Why do the basics of the cushion waterproofing
Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do
Q:What is the waterproof layer and the waterproof cushion in the tile roof?
Waterproof layer: set in the tile or metal sheet below, from the waterproof, moisture-proof structure of the layer. The waterproof cushion plays an important role in the tile surface, because the "tile" itself can not be counted as a waterproof material, only tile and waterproof cushion combination to form a waterproof fortification.
Q:Is it possible to make a waterproof layer
2, waterproof layer: In order to prevent the rain into the roof, groundwater into the wall, basement and underground structures, indoor water into the floor and walls and other materials layer.
Q:Do you need a cushion for roof waterproofing?
Roofing layer of leveling layer is usually used 20mm thick 1: 2.5 cement mortar. The leveling layer may be made directly on the structural concrete surface, or it may be made on the insulation layer and is provided for the construction of the waterproof material.
Q:The top floor made waterproof playing cushion layer of how to do
2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.
Q:Large area ground concrete cushion seam Why is the separation of joints generally concrete
hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
Q:Roof waterproof mattress should play the number of centimeters appropriate
Roof waterproofing can not use a single waterproof material, must be rigid and flexible combination of construction, flexible waterproof stretch is good, a little bit of settlement or deformation will not damage the waterproof layer. Rigid waterproof (ie mortar waterproofing agent) waterproof at the same time, can play a protective role, waterproof layer is not easy to be destroyed.
Q:Cushion, waterproof layer construction to do what information
1, the cushion to do template inspection batch information. Waterproof to do waterproof shelter, waterproof inspection batch, waterproof detail structure.
Q:Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
Q:Can the floor tiles be removed from the cement mats on the prefabricated board floor?
Prefabricated board surface is best to do some cement mortar cushion, can prevent the decoration of the water generated to the downstairs.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords