Scaffolding Standard Butterfly Wing nuts

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

size:

15/17mm,12mm

color:

white,yellow

material:

ductile cast iron

weight:

0.3kg

Item:

Scaffolding Standard Butterfly Wing nut

finish:

black,electroplate

type:

formwork accessories





Packaging & Delivery

Packaging Detail:in bulk/pallet or as your requirements
Delivery Detail:20-45 days or timely

Specifications

Scaffolding Standard Butterfly Wing nut 
1.Material:ductile cast iron 
2.Size:15/17mm 
3.Weight:0.3kg 
4.Surface: black,zincplat

 

 Scaffolding Standard Butterfly Wing nut  

 

 

 

 

Product Description

 

  

 

1. Product Description

 

The details as follows,

 

Materialductile cast iron
Diameter15/17mm,
Size/lengthbase plate100mm,110mm
Surface treatmentblack,zinc plate
Weight0.3kg
Packagein steel pallet or plywood pallet,in bulk or customized
Payment TermsTT,LC,we can contact in details
Delivery time20-45days

2. Our Main Manufacturing

 

(1)   Scaffolding System: 

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories:

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

(3)   Scaffolding Couplers/Clamps:

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

(4)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How old do u have to be to get a Scaffolding piesrcing ?
Daddy didn't hug you a lot I take it. Are you going to get a tramp stamp too? Remember if you want to be a proper non-conformist you have to wear the uniform.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:Scaffolding????
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s
Q:A painter and a scaffold?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:Which kind of scaffolding is the most convenient and time-saving?
The advantages of the new scaffold (compared with the bowl button) are as follows:1, with sufficient mechanical strength, stiffness and stability, safe and reliable work.2, the node connection without frame degree, has the ability to self lock, installation and disassembly flexible and quick, easy to grasp, support, removal efficiency than the bowl buckle type multifunctional scaffolding about three times, can save labor, labor, save time. In the process of construction, opening and closing channels at any time.
Q:Can you do the outer scaffolding?
6 15cm. When the oblique rod in a span of two step distance, it is appropriate in the intersection of the large cross bar to add a small bar, the oblique abdominal rod fixed on its protruding end. 7, scissors (1) of the scaffold bridging with columns, longitudinal and transverse horizontal rod synchronous erection, with long scissors along the elevated continuous layout
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:I need to be guided to supplier of Aluminum Scaffolding?
Please okorder.com Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat