• Scaffolding Formwork Accessories Butterfly Nut System 1
  • Scaffolding Formwork Accessories Butterfly Nut System 2
  • Scaffolding Formwork Accessories Butterfly Nut System 3
Scaffolding Formwork Accessories Butterfly Nut

Scaffolding Formwork Accessories Butterfly Nut

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

uick Details

Place of Origin:
Hebei China (Mainland)


Model Number:
GT-BOLT
Standard:
GB,GB, DIN, ISO, ANSI, ASTM, JIS, etc
Name:
GI Butterfly Bolt and Nut
Size:
M4-M24
Length:
6mm-60mm
Grade:
4.8, 6.8, 8.8, 10.9, 12.9
Material:
Carbon steel,stainless steel, alloy steel,etc
Finish:
Plain, black, zinc-plated, HDG, dacromet,etc
Package:
Bag, carton, then on pallet, or according to customers' requirement
Usage:
Construction, machinery, vehicle, ship, bridge, railway, tunnel, etc
Free Sample:
Available

Packaging & Delivery

Packaging Detail:Bulk in carton, then on pallet, or according to customers' requirement
Delivery Detail:Within 15 days after confirming the deposit

Specifications

GI Butterfly Bolt and Nut
1.Size:M4-M24
2.Length: 6mm-60mm
3.Material:carbon steel, ss, etc
4.Finish: plain, zinc, black

Butterfly Bolt

NameGI Butterfly Bolt and Nut
Place of OriginYongnian, Hebei, China
SizeM4-M24 or non-standard as request&design
Length6mm-60mm or non-standard as request&design
FinishPlain, black oxide, zinc plated, HDG, passivated, YZP, dacromet, etc
Material

Carbon steel:  Q235A,  Q345B

Stainless steel:  201 304, 321, 304L, 316, 316L

Alloy Steel:SCM435

Grade4.8, 6.8, 8.8, 10.9, 12.9
StandardGB, DIN, ISO, ANSI/ASTM, B7, BS, BSW, JIS etc
Non-standardsOEM is available, according to drawing or samples
SamplesSamples are free.
Package

Bulk in master cartons, then on pallets, or according to customers' requirement

PaymentL/C or T/T (30% in advance and 70% against the copy of BL)
DeliveryWithin 15 days after confirming the deposit


Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:Want to rent the scaffolding in the county, you need to cast how much money
In addition, there are disc scaffolding and other accessories, so you can estimate how much you need to invest
Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:Scaffolding installation and precautions?
The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:I think that'd be extremely entertaining.
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q:Which loads are considered in the design of the scaffold
1 the weight of the frame structure: including the vertical rod, vertical horizontal bar, horizontal horizontal bar, scissors, fasteners, etc.;2) structure, accessories weight: including the foot board, railings, foot boards, safety nets, such as the weight of protective facilities.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords