scaffolding lock pins of buliding system

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
China (Mainland)


Model Number:
Light duty, Heavy duty
color:
red blue yellow etc.
height:
2-3.5m
Material:
Q235,Q275,Q345...
finished:
galvanized,painted,power coating
Certificate:
ISO9001
Pin:
G-pin or Straight-pin
nut:
cup nut or as your requirement
plate:
flower plate or square plate
Base plate:
120*120*4mm

Packaging & Delivery

Packaging Detail:50/60 per bundle.
Delivery Detail:30days

Specifications

1.Adjustable Post
2.Material:Q235,Q345...
3.Type:Light/Heavy Duty
4.Surface Treatment:Galvanized,Powder Coating,Painted

adjustable steel support:

1. Products Name:

Steel prop, Scaffolding Prop, shoring prop, formwork prop, heavy duty prop, post shore, shoring post, shoring systems, Acrow prop

2.Surface treatment:

Powder Coating, hot-DIP galvanized, electro galvanized, painting

3. Package:

Steel Pallet, customized package

4. Material:

Q235, Q275, Q345

5. Type:

Light duty, Heavy duty

6. Finished:

Galvanized, painted, powder coating, hot DIP galvanized

7. Max Height:

2900mm-5000mm

8. Min Height:

500mm-4000mm

9.Screw Adjustment:

150mm, 200mm

10.Outer Pipe Diameter:

48mm, 56mm, 60mm, 70mm

11. Thickness of Outer tube:

1.2-3.5mm

12. Inner Pipe Diameter:

40mm, 48mm, 60mm

13. Thickness of Inner Pipe:

1.5mm, 1.6mm, 1.8mm, 2.0mm, 2.5mm, 3.0mm

14. Top and Base plate Size:

120x120x3(4 or 5)mm, 150*150*5mm

15. Weight:

5.0kg-50.0kg

16. Handle nut weight:

0.6kgs to 1.5kgs

17.Payment terms:

T/T, L/C, Westen Union

18. MOQ:

1*20'FCL

19. Deliveiry time:

15-25Days

20. OEM service:

Can make as customer's request drawing

21. Quality:

ISO9001

22. Usage:

Concrete Construction Works

23.Note:

When the adjustable height more than 4 meters, suggested using a tripod.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The role of the external scaffolding and the relevant provisions?
These two functions are often concurrent. With the protection of the role of security, in order to play the role of height operation; can not guarantee the safety of the role, the construction personnel can not operate on the above. These two functions, the protection of human safety is the first. Construction workers in the scaffolding on the construction work, there is a sense of security, construction progress, the quality of the project is sufficient protection, in order to create good economic benefits. Otherwise, once the danger of scaffolding, will cause many casualties, causing significant losses. Therefore, in the development of scaffolding support programs and scaffolding erection, we must firmly grasp the quality.
Q:Which accessories are included in a movable scaffold
Chinese now used in the steel pipe scaffold material made of steel tubular scaffolding, bowl button steel scaffolding, buckle disc scaffolding, socket type steel pipe scaffolding, scaffolding, ladder scaffolding, and every kind of the scaffolding, hanging scaffold and the scaffold steel pipe materials.
Q:what's the meaning of scaffold?
scaffold /, -f(@)ld/ · n. 1 a raised wooden platform used formerly for public executions. 2 a structure made using scaffolding. · v. attach scaffolding to. – DERIVATIVES scaffolder n. – ORIGIN ME: from Anglo-Norman Fr., from OFr. (e)schaffaut, from the base of catafalque.
Q:Erection of scaffolding accessories
Erection of scaffolding accessories:Door frame should be installed from one end to the other end of the extension, and layer by layer to change the direction of the set, not the opposite. After the completion of one step, should check and adjust its level and verticality. Scaffolding should be built around the building, continuous, synchronous erection elevation, in the form of a closed structure around the building; if not closed, the scaffold should be added at both ends of the wall.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:examples of scaffolding?
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
Q:How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.
Q:How to calculate the rental price of portal scaffolding
Under normal circumstances, the small local rental price: 2.5-3.0 yuan / set / day
Q:Advice to anyone thinking about getting an industrial/scaffold piercing?
Most piercings need 6 months to fully heal. Industrial will take up to a year to do so. You have to keep the jewelry in and do not take it out ( not even once ) for the whole period of 1 year. This means that you can't hide it for school. You can't put a retainer on also, cause only titanium or stainless steel material are proper for an open wound aka a new piercing. This piercing is not easy to heal and can stay irritated for long. It goes through cartilage and you have to be really careful with the aftercare and the piercer's info if you want to keep the piercing and yourself healthy. You have to be careful and not touch it or play with it and twist it or take it out. You clean this piercing with sea salt soaks or non alcohol antibacterial soap 2-3 times a day. You dry it with paper towels. If you can do the above daily and be extra careful go get it done. Gluck

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range