• scaffolding lock pins of buliding system System 1
scaffolding lock pins of buliding system

scaffolding lock pins of buliding system

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
China (Mainland)


Model Number:
Light duty, Heavy duty
color:
red blue yellow etc.
height:
2-3.5m
Material:
Q235,Q275,Q345...
finished:
galvanized,painted,power coating
Certificate:
ISO9001
Pin:
G-pin or Straight-pin
nut:
cup nut or as your requirement
plate:
flower plate or square plate
Base plate:
120*120*4mm

Packaging & Delivery

Packaging Detail:50/60 per bundle.
Delivery Detail:30days

Specifications

1.Adjustable Post
2.Material:Q235,Q345...
3.Type:Light/Heavy Duty
4.Surface Treatment:Galvanized,Powder Coating,Painted

adjustable steel support:

1. Products Name:

Steel prop, Scaffolding Prop, shoring prop, formwork prop, heavy duty prop, post shore, shoring post, shoring systems, Acrow prop

2.Surface treatment:

Powder Coating, hot-DIP galvanized, electro galvanized, painting

3. Package:

Steel Pallet, customized package

4. Material:

Q235, Q275, Q345

5. Type:

Light duty, Heavy duty

6. Finished:

Galvanized, painted, powder coating, hot DIP galvanized

7. Max Height:

2900mm-5000mm

8. Min Height:

500mm-4000mm

9.Screw Adjustment:

150mm, 200mm

10.Outer Pipe Diameter:

48mm, 56mm, 60mm, 70mm

11. Thickness of Outer tube:

1.2-3.5mm

12. Inner Pipe Diameter:

40mm, 48mm, 60mm

13. Thickness of Inner Pipe:

1.5mm, 1.6mm, 1.8mm, 2.0mm, 2.5mm, 3.0mm

14. Top and Base plate Size:

120x120x3(4 or 5)mm, 150*150*5mm

15. Weight:

5.0kg-50.0kg

16. Handle nut weight:

0.6kgs to 1.5kgs

17.Payment terms:

T/T, L/C, Westen Union

18. MOQ:

1*20'FCL

19. Deliveiry time:

15-25Days

20. OEM service:

Can make as customer's request drawing

21. Quality:

ISO9001

22. Usage:

Concrete Construction Works

23.Note:

When the adjustable height more than 4 meters, suggested using a tripod.


Q: HELP me out please. im struggling with this book
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q: Exterior wall scaffold construction plan?
Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
Q: Write a scaffold method for 743,425 divided by 365EASY 10 points
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q: I think that'd be extremely entertaining.
New Jack only likes to beat up fat guys (Vic Grimes) and old men (Gypsy Joe). I don't think he'd want to try messing with Cena lol
Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q: What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q: 21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q: What is the service life of the mobile scaffolding accessories?
Hot galvanized mobile scaffolding accessories for a period of 10 years or so, the surface does not require maintenance, in use without any restrictions. However, the cost is high, the raw materials needed to be more complex.
Q: i got my scaffold done quite a while ago and it still really hurts and is all lush and crusty,loli know it takes agessss to heal but could i take it out and put normall small earrings in each whole instead? Which would i have to use? thanks
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords