Scaffolding Formwork Drop Forged Double Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Brand Name: | Model Number: | |||
Type: | Scaffolding Part Type: | Kind: | |||
Standard: |
Packaging & Delivery
Packaging Detail: | Suitable for sea transportation, in Containers |
Delivery Detail: | 15 days |
Specifications
Drop Forged Double Coupler scaffolding couplers tubular scaffoldng system
Support Scaffolding System.
EN74
Drop Forged Double Coupler scaffolding couplers tubular scaffoldng system
Specifications
1.Supply scaffolding couplers and frames
2.Forged or pressed processes
3.British type,German type,American type,Italian type
We produce high quality couplers, in both drop forged and punching procedure, in according to EN74 and BS1139 standards, surface can be electro galvanization or hot dip galvanization.
Standard couplers are widely used with Ø48.3 steel scaffold tubes, we also produce a few number of special size couplers to suite with different diameter scaffold tubes, such as 34, 38, 60, 63 and 76mm. Also some special couplers are used for special functions, such as spigot support, deck retainer, toe board fixing, ladder bracket and so on.
- Q:Specification and type of scaffold erection
- 2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
- Q:Scaffolding scaffolding erection norms which requirements, who can say?
- Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards
- Q:Standard Specification for bowl buckle scaffold
- Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
- Q:What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
- unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
- Q:i just got it like 3 days ago and its no signs of infection and im just worried it might get that way. ive been reading online about people who got infections and people who had all this crap happen. what do i need to do to stop one from coming i mean i use contact solution and cotton swabs wipe it down with wet ones and clean it when i sweat and turn it twice a day.. im always careful about keeping it clean im a neat clean freak but is there anything else i can do to stop infection from coming
- sounds like what your doing is fine. just keep it clean that's basically all you can do.
- Q:Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
- Steel pipes need to be equipped with 210-220 fasteners, 90% of the cross fastener
- Q:What are the characteristics of Pankou scaffolding
- Ottohelix, scaffolding has large load strength, under reasonable mechanics, with a capacity of up to 200KN.Pankou scaffolding saves the amount of steel.
- Q:When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
- Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
- Q:i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
- the industrial take over a year to FULLY heal. and it will be for a while.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding Formwork Drop Forged Double Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords