• Ring Locked Scaffolding with Professional System for Construction System 1
  • Ring Locked Scaffolding with Professional System for Construction System 2
  • Ring Locked Scaffolding with Professional System for Construction System 3
  • Ring Locked Scaffolding with Professional System for Construction System 4
  • Ring Locked Scaffolding with Professional System for Construction System 5
Ring Locked Scaffolding with Professional System for Construction

Ring Locked Scaffolding with Professional System for Construction

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Ring-lock Scaffolding

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction. 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Ring-lock Scaffolding

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3.   Ring-lock Scaffolding Images


      


4.   Ring-lock Scaffolding Specification

     .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load

     .Design load of cross bar




    .Design Lord of base:Pmax=60KN

 

5.   FAQ of Ring-lock Scaffolding

     1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ring-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 


Q:Basically iv had my scaffold for around 2 years, it is completely healed. About six months ago i had to take the single bar out and put two separate bars in, i went to the shop i had it done at and they sold me two clear labret bars, at the time i did not realise that these were much thinner than my normal bar and because after time they became brittle and discoloured i changed them to two metal eyebrow bars as a short term solution, i need some advice on what to do regards changing back to a single scaffold bar, i would like to freely be able to change between a single bar and two bars/hoop, but im sure it would cause too much damage to my ear and too much pain to keep stretching it to a scaffold bar to then let it go down and stretch it again i will be needing a single bar at weekends not in the week, what should i do?
To return to the bar, you'll need to go to your piercer to have it reinserted using a small taper. Switching it back and forth from a single bar to hoops is absolutely not recommended because the hoops have a curve and will cause the bar to not fit properly because it will change the angle of the piercing, you can use straight barbell studs that are the same gauge as your single bar though without complication.
Q:i am considering getting my industrial /scaffold piercing done tomorrow just wondering price in (GBP) (?) i am in the uk ....pain rating ?healing time personal expirience and what to expect how old do you ave to be without parental consent ?
1. sorry, i live in the usa, dont know how to convert money. here it was 56 dollars 2. the first hole hurt at about a 5, the second hole i could barely feel. id give it a 0. 3. 4-6 months til you can change it and have it been comfortable, up to a year for it to be completely healed. 4. i got mine done about a month ago, doesnt really hurt anymore, just when you put a lot of pressure on it. lots of cursties, even when i do sea salt soaks, haha. 5. pain for the first week. lots and lots of pain a soreness. then a really cool piercing. 6. not sure about in the uk, but here its 18 and above. if youre a minor you need a parent.
Q:this is the excerpt-We have witnessed a people [Muslims] to each and every one of whom death is preferable to life, and humility to prominence, and to none of whom this world has the least attraction. Their leader is like one of them: the low cannot be distinguished from the high, nor the master from the slave. And when the prayer time comes, all wash their hands and feet and humbly pray.QUESTION: How does this writer describe the Muslim people?Sorry i know this is my homework i just need help analyzing it. Is the writer describing them as unliked people? or people he respects?
people he unlikes and can u help me make an abc book about the revolutionary war
Q:Can a guardrail on a scaffold be used as an access point?
No NEVER! It is a breach of Health and Safety regulations.
Q:Another from the ministry of silly questions…I’d like to support a lightweight tarpaulin over my back yard. Single slope, high side attached to the house and low side attached to a scaffolding pole, running horizontally between two walls. Fair weather, no high winds or pooling. The run of pole would be 8 meters. The longest poles seem to be 6m, so I need to use a coupling. Will this be strong enough – ish? I imagine the most stressed point would be just around the edges of the coupling, so If I used two joints/couplings in the bar, wouldn’t I half the strain on a single one?Also if I made the joints at 1m and 7m would that be better than to have a joint in the middle where the most flexing will be?Also bit more expensive, but with Aluminium the bar will be 20kg lighter – buy will it be as strong joint wise?Will a tubular coupling be as good as a external one?If anyone knows.. Thanks!
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q:What is the horizontal spacing of the wall of the bowl buckle scaffold
Need to give you a standardized system to learn about ah? The arrangement of the wall parts shall meet the following requirements: (1) should be close to the main node, the distance from the main node should not be greater than 300mm;
Q:arnt scaffold /industrial piercing so pretty !!?
yes they are :) i like it and i am thinking of having one :) if you like it so much you should have one too! i bet youll look great if you love it:)
Q:at what age can you get a scaffold/industrial piercing in england without parental consent?
there actually are no laws in the UK about piercings other than the genitals and female nipples (you have to be 16 to get pierced in any of those locations) it is up to individual studios on what age they don't require parental consent. the best thing to do would be to contact your local shop.
Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
According to the bearing capacity of the vertical bar, according to the gravity of the beam and slab, the stress analysis of the horizontal member is carried out
Q:is it safe to get an industrial/scaffold and weaving piercing at the same time?
It's not SUPER dangerous, but I wouldn't recommend getting them at the same time.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords