Ring Lock Scaffolding Meet International Standard of Safety

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Ring-lock Scaffolding

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Ring-lock Scaffolding

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs


3.   Ring-lock Scaffolding Images

 

4.   Ring-lock Scaffolding Specification

    .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load

    .Design load of cross bar

    .Design Lord of base:Pmax=60KN


5.   FAQ of Ring-lock Scaffolding

     1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ring-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Should I get a Scaffolding Piercing?
You can get one and to prevent it you have to clean the piercing with listerine a girl i know named myra she got a cauliflower because she cleaned it with alcholo and it looks so nastyyou need to clean it with listerine.
Q:I'm thinking about using commercial industrial scaffolding for my next deer stand.?
I don't see why not. It would certainly be sturdy enough, just be sure to secure it to the tree. I've known guys that have made them out of electrical conduit so I don't see why scaffolding wouldn't work.
Q:Physics Problem - A 56.0kg painter is on a uniform 23.5kg scaffold supported from above by ropes?
Torques left, about right rope. Scaffold is 6m long. 23.5/6 = 3.91667kg per metre. 3.91667 x 5m = 19.58335kg/m. 5kg x 3m = 15kg/m. Total = 34.58335kg/m torque. Torque right. 1 x 3.19667 = 3.91667kg/m. Subtract right from left, = 34.58335 - 3.91667 = 30.6667kg/m can be applied by the painter. 30.6667/ 56 = .548 metre, the painter can move to the right of the right rope.
Q:How much is the price of the bowl buckle scaffold
The average price of 150 yuan / ton / month, bowl buckle scaffolding rental costs of -3 minutes / M / day, different regions, different prices.
Q:How to calculate the amount of steel tube in the template system of the bowl buckle scaffold?
According to the bearing capacity of the vertical bar, according to the gravity of the beam and slab, the stress analysis of the horizontal member is carried out
Q:my scaffold piercing wont stop bleeding, really scared, please help?
go see a doctor, that doesn't sound good.
Q:Japan SS 03 scaffolding system advanced
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Bowl buckle scaffold and fastener type scaffolding
In the 40s of last century, the United Kingdom, more than 50 years of foreign use. After so many years of use, because of the carrying capacity is not easy to control, most of them can only be used as the construction of such a lighter load of the project.
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:How do I sleep with an Industrial/Scaffolding piercing?
Mine was too painful when I got the industrial done to sleep on the same side. I took a blanket, rolled it up, and placed it at my back so it would deter me from rolling over onto it. After about a week I was good to go on sleeping on that side. However, it#x27;s been two years and sometimes it gets too sore to sleep on the side with the industrial. I have definitely learned that it will always be sore if I constantly sleep on the same side every night instead of rotating sides. I learned the hard way about 2 weeks ago when I got the opposite side pierced at the rook. Good luck!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range