• Quick Lock  System Scaffolding with  Steel Q235 Q345  CNBM System 1
  • Quick Lock  System Scaffolding with  Steel Q235 Q345  CNBM System 2
Quick Lock  System Scaffolding with  Steel Q235 Q345  CNBM

Quick Lock System Scaffolding with Steel Q235 Q345 CNBM

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Lock System Scaffolding with  Steel Q235 Q345 

Name

Quick Lock System Scaffolding with Steel Q235 Q345 

Place of Origin

China

Brand name

CNBM

Main Material

Q345 ,Q235

Surface Treatment

High Protected Painted, Powder Coating, Electric   Gavenized, Hot Dip Gavenized.

Color

Silver, Orange

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

20ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day


Quick Lock  System Scaffolding with  Steel Q235 Q345  CNBM

Quick Lock  System Scaffolding with  Steel Q235 Q345  CNBM

Specification:

 

Quick Lock Standard / Verticals
ModelDescriptionWeight(kg)Weight(lbs)
QL.S.3000Quick Lock Standard 3000mm (9'10")13.3229.38
QL.S.2400Quick Lock Standard 2400mm (7'11")10.8123.83
QL.S.1800Quick Lock Standard 1800mm (5'11")8.2918.28
QL.S.1200Quick Lock Standard 1200mm (3'11")5.7712.73
QL.S.600Quick Lock Standard 600mm (2')3.267.18




Quick Lock Ledger / Horizontals
ModelDescriptionWeight(kg)Weight(lbs)
QL.L.2400Quick Lock Ledger 2400mm (7'11")8.8119.43
QL.L.1800Quick Lock Ledger 1800mm (5'11")6.6614.69
QL.L.1500Quick Lock Ledger 1500mm (4'11")5.5812.31
QL.L.1200Quick Lock Ledger 1200mm (3'11")4.519.94
QL.L.900Quick Lock Ledger 900mm (3')3.437.57
QL.L.600Quick Lock Ledger 600mm (2')2.365.20




FAQ

1. What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

2.What are the certifications of your products?

Certified by SGS, BS1139, EN74, Local Test Report.

3. How long is the warranty period for your product?

Our products warranty is 2 years.

Q:i work in construction.
Thats work not a workout.
Q:has anyone done this? Does this work out really well?thanks,Chad
Sounds like a good idea. Only women would complain about the looks, if they are an outdoors person.
Q:Tell me how much the shear strength can reach MPa, thank you
The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
Q:An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:Scaffolding and scaffolding, what is the difference between manufacturers, there is no professional answer?
Different node: node of scaffolding is scaffolding, bowl, node is the eight hole discThe diagonal rod lap in different ways: diagonal scaffolding with ordinary steel pipe fastener, oblique rod, scaffolding is used with the oblique rod.
Q:I got mine done about 10 weeks ago, with the two rings either side of the ear to give it healing space, then about 2 weeks ago, got the bar put through it... but I still can't sleep/lie on it comfortably. How long after getting the piercing, roughly, have people been able to sleep on their without it hurting?
It takes 6-12 months for a cartilage piercing to heal when done properly with a needle and double that time if a gun was used. I don#x27;t know why they pierced you with rings (should never be used in a scaffold#x2F;industrial piercing) and especially why they changed it to a bar so soon. You should have been pierced with a bar to begin with because changing the jewelry like that causes irritation and prolongs healing time. I think you need to find a different piercer.
Q:Hey guys, so I got my scaffolding (ear) done yesterday. My piercer told me NOT to clean it, and that the best thing for a cartilage piercing is to quot;leave it bequot; I trust this advice, but I wanted to ask your opinion or methods that worked for you :) Thanks lt;3
To be perfectly honest, I don't clean my piercings while they are healing. I follow the LITHA (leave it the hell alone) method and have never, ever dealt with infection in any of my piercings. But I have also had a pretty good amount of piercings and know my body heals them just fine to not have to mess with them. If this is one of your first piercings and you've not healed a cartilage piercing before, I'd stick to doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water.
Q:I'm 15 atm, I want either an industrial piercing now or a scaffold piercing that I can connect later. I may be getting a scaffold piercing instead, seeing as school regulations here probably won't allow a full industrial. It might just be a phase but I've wanted one for a while, and if I don't like it I can always just keep the scaffold piercing if I decide to get that.What I'm wondering is: Are there any people who have an industrial? does it annoy you? does it get infected easily? and how long did it take to fully heal?I'd appreciate all answers, even if you only know someone with one. Thanks in advance.
max said it perfect.. just keep it clean .. dont get that industrial caught on anything itll rip half your ear off ive seen it and that will cost alot to fix and is permanent .. so be careful climbing trees etc .. doing kid stuff with advanced piercing work.
Q:In the process of high-rise building construction, bowl buckle type steel pipe scaffolding foundation and foundation treatment should meet the requirements
The foundation and foundation treatment of bowl buckle scaffold should meet the requirements of standard JGJ166.
Q:The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
Fulcrum spacing is 60cm longitudinal timbers, fulcrum M, square distance is W then according to uniform load distribution Q=p/wThen according to the number of cross W-1 span continuous beams with calculated Pmax and MmaxIn the calculation of I, W, E the final Mmax/W< limit stress but also to calculate the degree of winding </1400L (I value according to the size of the calculation, i=bh^2/6)The first layer of wood even finished the calculationThen go down and check it outThe second layer is the fulcrum of wood 90cm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords