Painted Frame Scaffolding System for Construction
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of H Frame ScaffoldingDescription
As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.
Packaging & Delivery
Packaging Detail: | Frame system scaffolding package in the container, or according to your requested |
Delivery Detail: | after deposit 10-15 days |
2. Main Features of Frame Scaffolding
1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.
2)A complete set of frame system scaffolding usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.
3) Frame system scaffolding is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.
4) Frame system scaffolding is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .
5) Frame system scaffolding can be used for the building decoration which is the light duty scaffolding, it is more easier for moving.
6) Frame system scaffolding are dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness
3.Frame Scaffolding product pictures:
4.Frame Scaffolding Product Description
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1Can we provide different size of Frame system Scaffolding as customer need
The answer is Yes, customer can provide the Tec spec to us and Drawing for production.
2How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q:I plan on playing tennis and doing track and field at school... Im getting the piercing this month and it won't be healed in time to take it out. How can I conceal it or possibly even help it heal faster??
- Why no longer enable your ear pieced lower back while you're off out of your prepare like in case you have a much better than one week holiday so which you do no longer could desire to get rid of and placed your jewelry many of the time. a minimum of you could evade preserving your ears many of the time and evade the an infection. you could enable your ears heal ideal. in case you could no longer wait to have your ear pierce lower back once you get rid of and placed decrease back your jewelry make it beneficial you sanitized your palms by skill of washing and employing alcohol. placed Neosporin (antibiotic ointment) on your new pierced jewelry and on the jewelry itself in the previous putting it decrease back. in the previous additionally they use medicated string or thread on the ears for the piercing of latest child toddlers.
- Q:Fastener type steel pipe scaffold composed of components
- Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
- Q:What is rolling scaffolding?
- well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
- Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q:Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
- Tip: don't have it done.
- Q:Method for inspection of foot hand frame fittings
- Or "low pressure fluid delivery welded steel pipe" GBT 3092
- Q:looking for a scaffolding job in dubai can anyone help?
- Hi okorder , we are Dubai based scaffolding contractor.
- Q:Which loads are considered in the design of the scaffold
- The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
- Q:How to set up the temporary structure of the external structure of the balcony on the two structure
- Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.
- Q:Fastener type steel pipe scaffold accessories
- fastenerFastener type steel pipe scaffold fastener malleable iron casting should be adopted, its basic form has three kinds: vertical cross bar for a connection between the rectangular fastener, fastener for rotating connecting parallel or oblique bars and rods for butt joint butt joint fastener.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Painted Frame Scaffolding System for Construction
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords