Frame Scaffolding System for Construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
10000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Frame Scaffolding System for Construction

1.Structure of H Frame ScaffoldingDescription 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

 

Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days

 

2. Main Features of Frame Scaffolding

1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2)A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) Frame system scaffolding  is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .

3.Frame Scaffolding product pictures:

 

Frame Scaffolding System for Construction

 4.Frame Scaffolding Product Description

Frame Scaffolding System for Construction

 

 5.FAQ

 We have organized several common questions for our clientsmay help you sincerely

1)How about your company?

CNBM International Corporation, China National Building Materials (Group) Corporation, is one of the largest companies in China building material & equipment industry.

 2)Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

3)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is my scaffold peircing ok? x?
u shud check f its swollen and if there is more painin go to the doctors
Q:what's the meaning of scaffold?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Cross barName specification A (mm) B (mm) theoretical weight (kg)
Q:A painter and a scaffold?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:Cantilever scaffold technical disclosure
Steel pipe anti rust paint. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q:Scaffolding steel planks with rubber end caps?
Maybe something like a window washers scafolding planks...?
Q:is my scaffolding piercing infected/?
It could be infected or it could just be irritated, kind of hard to say. Irritation is usually red, sore, maybe swollen. Infected is red, swollen, painful, hot to the touch, dark yellow to green discharge. Best bet is to do warm sea salt soaks 2-3 times a day for 10-15 minutes each (1/4 teaspoon sea salt per 8oz water) and hit up your piercer for a professional opinion. Do NOT remove the jewelry until you are 100% sure it isn't infected.
Q:Scaffolding Piercing Help?!?
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range