Frame Scaffolding System Painted Type for Construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
10000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Frame Scaffolding System Painted Type for Construction


1.Structure of H Frame ScaffoldingDescription 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

 

Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days

 

2. Main Features of Frame Scaffolding

1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2)A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) Frame system scaffolding are dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness

 

3.Frame Scaffolding product pictures:

Frame Scaffolding System Painted Type for Construction

 4.Frame Scaffolding Product Description

Frame Scaffolding System Painted Type for Construction

 

 5.FAQ

 We have organized several common questions for our clientsmay help you sincerely

1)What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

2)Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

3)What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
Q:Do you have to have a certain ear shape for Industrial/Scaffold Piercings?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
Q:Do I twist my scaffold piercing?
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:Have you heard of meat on a scaffold?
Depends on how much it costs to stimulate the growth.
Q:Standard Specification for bowl buckle scaffold
The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
Q:how long should i wait to change my scaffolding piercing?
I wouldn't suggest changing it for at least 6 weeks. You have to allow the skin to heal before touching, turning or changing the bar. If you do change it beforehand, you risk damaging the skin and cartilage surrounding the piercing. I know that I didn't change mine for about 8 weeks, and I haven't ever had a problem with it.
Q:Should you twist and Industrial/Scaffold Piercing?
i twisted mine alot and the cartlidge inbetween has ripped and it hurts unbelievably loads, so i wouldnt twist it
Q:Can you do the outer scaffolding?
The safety net is fixed on the side of the outer vertical rod of the scaffold. (2) the 16# wire safety net, strict and smooth. (3) the outer side of the scaffold shall be provided with a 1.2m high protective railing and a 30cm high skirting bar, and the top row protective railing shall be not less than 2, with a height of 0.6m and 1.2m.
Q:Should i rotate my scaffolding piercing?
Do what the piercer told you to do. If they didn't say and you are concerned, ring them and ask. Personally I would say don't; the fluid that the piercing naturally leaks while healing can cake on the bar and dry into tiny but alarmingly sharp lumps. If you push these into the piercing accidentally while turning it it will really really hurt! They can also damage the newly forming tissue, delaying healing and possibly creating excess scar tissue. The bar will move naturally with the movements of your body anyway within the constraints of (sorry if you're squeamish but I can't put it any more delicately) any crusting around the bar. Just keep it clean and keep hair and face products away from it and it should be great.
Q:Seeking for the safe construction scheme of mobile scaffolding!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range