• New PPR Orbital Pipes Fitting House Used with High Quality Made in China System 1
  • New PPR Orbital Pipes Fitting House Used with High Quality Made in China System 2
  • New PPR Orbital Pipes Fitting House Used with High Quality Made in China System 3
New PPR Orbital Pipes Fitting House Used with High Quality Made in China

New PPR Orbital Pipes Fitting House Used with High Quality Made in China

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Overview

1) Cold / hot water supply facilities for public buildings 
2) Food, electronic industry pipeline networks; Such as Pipeline networks for transporting all kinds of    corrosive liquids 
3) Drinking water production system pipeline networks;
4) Air conditioning facility pipelines
5) Pipeline networks for swimming pools
6) Agriculture and garden production transporting systems


Advantages:

1.No leakage ,pressure PN 10-16;

2.Well and high quality control ;

3.Environment friendly, non-toxic, good looking and long service life;

4.Light weight, easy to handle and transport;

5.Soft colors and excellent design, suitable for in stellation either exposed or hidden;


Applications of PPR Pipe :

1) Cold and hot water supply systems for civil and industrial constructions, e.g. in residential buildings, hospitals, hotels, school and office buildings, ship building

2) Drinking water systems and food industry pipe works

3) Central air conditioning system

4) Irrigating system for gardens and green houses

5) Public and sport facilities such as swimming pools and stadiums

6) For rainwater utilization systems.


Packaging Details:

1. Large carton: 515 x 400x 220 Cubage: 0.04532 M3 
Small carton: 390x255x250 Cubage: 0.0248 M3 
2. PE poly bag+ carton Delivery Detail: 15 days/ 20" container; 25 days/ 40HQ 


Product Description

1.Material   :

PPR

2.Color:

White,   Gray, Green, or as you required.

3.Size:

20-110mm

4.Logo:

CMAX   or Customized

5.MOQ

500pcs

6.Samples   Time:

(1)   4-5days-If you want to customize your logo.

(2)   1day-For our existing samples for reference.

7.OEM   Accepted

Yes

8.Certification   available:

Yes

9.Packing   Details:

Weaving   Bag

10.Production   Capacity:

5,000,000pcs   Per month.


Product Show

New PPR Orbital Pipes Fitting House Used with High Quality Made in China

New PPR Orbital Pipes Fitting House Used with High Quality Made in China

New PPR Orbital Pipes Fitting House Used with High Quality Made in China


FAQ

Q: How do you guarantee the quality of your product?

A: Every process will be checked by responsible QC which insures every product's quality.

Q: How much is your delivery time?

A: Normally within 30 days of receipt of LC original or prepayment, but mostly according to the specific requirements or the quantity

Q: I need sample, could you support?

A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect. Also you can have a visit to us, welcome to CNBM!

Q:I need to buy plastic (or clear colored) plastic tubes with caps. Approximately 5 or 6 inch in length and close to 1 inch or close to it in width. Would appreciate any suggestions where I find it.
the hardware giants like Lowe's and the Ho Depot are your best bet ... go in the store and ask for plastic tubing==== HEY !! you might do better to go to a friendly pharmacy and get some clear plastic medicine bottles ... go and ASK ... and if this is
Q:What is a paintball power tube used for?Im looking into an tippmann A5 power tube Delrin Front Bolt. Whats the difference and benefits.Thanks
The power tube is the part that holds the valve in the marker and helps direct air flow. Getting a new power tube will do NOTHING to performance. It has no performance valve what so ever. The front bolt is the part that helps push the ball out or the chamber. And getting a new one will help very very lil. So lil that it doesn't really matter. THis is because the stock front bolt on the tippmann markers is made so well that changing it doesn't make it any better because they will perform just about the same. Replacing the stock power tube to a full aluminum power tube is a good idea because after a while the stock plastic power tube does tend to break and when that happens it will cause air or co2 to leak. The aluminum one wont do that and lasts a lot longer.
Q:When the fire line is weak, the pipe or plastic pipe is used
Fire tube weak 3 hours fire resistance requirements, galvanized iron pipe and brush fire retardant coating can reach the acceptance criteria of the fire department, so please do not use PVC with the plastic pipe and tube, galvanized tube outside to brush fire retardant coating in order to achieve the 3 hour requirement.
Q:How do plastic tubes compare to polycarbonate tubes in terms of impact resistance?
Polycarbonate tubes generally have higher impact resistance compared to plastic tubes.
Q:Are plastic tubes resistant to pressure changes?
Yes, plastic tubes are generally resistant to pressure changes.
Q:How to install the wires, plastic pipes, pipes, hard, all set not go in,
Is the first line laying tubing, after threading.
Q:How are plastic tubes cut to specific lengths?
Plastic tubes are typically cut to specific lengths using various cutting methods such as sawing, mechanical cutting, or laser cutting. The chosen method depends on the type of plastic, the required precision, and the production scale.
Q:How are plastic tubes labeled for identification?
Plastic tubes are commonly labeled for identification using various methods such as adhesive labels, heat shrink sleeves, direct printing, or color coding.
Q:Can plastic tubes be used for gardening?
Yes, plastic tubes can be used for gardening. They can be used as containers for growing plants, as irrigation systems, or for protecting young plants.
Q:Plastic pipe leakage can use plugging Ling?
The safest solution is to replace the leaking fittings. Off valve, drain, with PPR scissors cut Water Leakage parts of pipeline, PPR soup machine, with a direct it. The process is uncomplicated and the skilled worker will be able to solve it in 30 minutes.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords