Modular Sentry Box

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000㎡ m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

This product belongs to Module System structure.

The structure load is mainly borned by SFLC board. It builds high efficient, energy saving and environmental house which integrates construction,water heating electricity and a set of construction equipment.

Advantages:

1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle

6. Thermal Insulation
7. Seismic and wind resistance
8. Roof Load-bearing

Packing:

light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Waterproof building materials after the construction of drums, bubble is what reason?
Reason 3: synthetic polymer waterproofing membrane construction, if the adhesive is not fully dry on the eager to paving the membrane, resulting in a solvent residue in the coil inside, when it evaporates, it will form a bubble. Control measures: the use of cold and cold method of paving, the brushing of the adhesive to be uniform, to be dry when the handle (refers to touch) is not bonded, before paving the membrane, while compaction. In particular, to prevent the accumulation of adhesive too thick, dry operation caused by the film from the drum.
Q:Color steel sandwich panel wall too heavy how to install?
Fixed the area surrounded by the house. And then wipe with a sandwich panel inside, remember to play the following rivet yo sandwich board on a piece of a piece of sandwich (the sandwich plate itself slot) corner of the seat to pull the window with aluminum is empty out, so you can save a little (Of course you can dig your own wall in the installation of the wall can also be empty) out of the window to be filled with trough aluminum in the installation of plastic windows can be a door on their own in a full version of the cut with the top of the aluminum roof with angle iron and The following wall panels are connected and screwed.
Q:Plasterboard to cover up crumbling wall?
iwould rip off the old the put new like u want to . is there any moisture problems in this area any side of mold or mildew?
Q:Split toilet and conjoined toilet which is good
There are two kinds of split toilet, one is the old-fashioned split, that is, the tank is fixed with the expansion screw on the wall, the water tank and the base has a month bend connection, the volume of 9 liters, one is the tank above the base, there are plastic screw connection , Said the box-type Siamese. Split seat will be installed more complex, water, accessories less and less, do not advocate. Siamese seat will be sub-straight and siphon type two: Among them, straight-type and sub-ramping and straight-type two flushing effect. Features is the flushing channel diameter is large, not easy to plug. Home laundry water can be used. Province! Siphon seat flush channel is relatively small, then the channel wall with no glaze is quite important. Channel wall spray glaze is a process that is costly. Too cheap seat is not this.
Q:What are the advantages of high density polyethylene HDPE geomembrane ?
High density, good anti-seepage ability, light weight.
Q:What is the wire mesh in front of the foundation beam
Wood can be used, but the surface is relatively smooth, after pouring, the bond will be worse; in this way, the construction is more convenient, leaving the rough concrete surface.
Q:What color curtains would compliment a sea mist green wall?
This Site Might Help You. RE: What color curtains would compliment a sea mist green wall? The furniture is a rust leather color. Tables are oak. Someone told me red would compliment it, but Im not too sure. I am looking into changing the curtains for the cold months ahead, and will be buying energy saver curtains.
Q:Sauna lock can not open how to do
Escala and other well-known lock factory mostly use tiger hotolube or Krupp kluber all synthetic lock lubricants.
Q:Price for ceramic tile installation?
Sometimes it is not only how many square feet of tile is required to put down, the formula also must take into consideration the difficulty of the installation. The difficulty is proportional to the number of cuts that are required to be performed and weather these cuts are straight or curved. There are also other expenses. 1.Soundness of sub floor. If poorly supported the tile will crack. 2.Does installation require removal of base molding and its replacement following the installation? 3.Moving of the appliances/furniture and so on. Finally, now days and roughly, the installer wants to make $260-400 per day. Tiling is never 1 day job since application of grout is required at least 24h following the installation. So if the job is straight forward 3.5 - 4.5 per square feet is a good price on the average. Considering it is with prep $5.00 sounds like Ok. New York City or LA for example may cost a bit more. Let me know if it helps.
Q:Whats the best way to learn real estate development?
There is no way to learn real estate development without actually doing it. You can take basic classes in real estate, finance, land planning, architectural design, but nothing will prepare you for actual development. You will have to learn how to work with people that purchase, finance and design projects. Each of these areas have their own nuances and getting experience is the only way. I don't know how old you are but real estate development is not for the fool hearty. You must have a good sense of finance and a great deal of patience. Its tough work and their are so many things that can and do go wrong. Get a degree from a reputable university and then get a job with a developer and when you are ready then go out on your own.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Premium Related Products