Heavy duty cuplock type construction scafoldings

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Feature

1. Cuplock scaffolding system has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.

2. Cuplock scffolding is made by Q235 steel which is strong and durable.

3. A complete cuplock scaffolding system includes standards, ledgers, or diagonal braces.

4. The accessories of cuplock scaffolding system are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc. 
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends. 

Specification     

Item Name

Cuplock Scaffolding

Brand Name

Queen

Raw Material

Q235 /Q345steel Grade

Components

Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade

Surface finish

Electric Galvanized/HDG/Powder coated

Size

 

Pipe size:48.3mm

Thickness:3.25mm

Usage

Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building

Packing

By Steel pallet or bulk

 

 

 

 

 

 

 

Standard

48.3*3.25*500mm

3.5kg

48.3*3.25*1000mm

5.6kg

48.3*3.25*1300mm

8.0kg

48.3*3.25*1500mm

8.75kg

48.3*3.25*1800mm

10.6kg

48.3*3.25*2000mm

11.4kg

48.3*3.25*2500mm

14.0kg

48.3*3.25*3000mm

16.70kg

8.3*3.25*4000mm

20.36kg

 

 

 

 

 

 

Ledger

        

48.3*3.25*650mm

2.54kg

48.3*3.25*914mm

3.6kg

48.3*3.25*1065mm

4.10kg

48.3*3.25*1150mm

4.7kg

48.3*3.25*1570mm

5.76kg

48.3*3.25*1829mm

6.62kg

48.3*3.25*2130mm

7.62kg

48.3*3.25*2438mm

8.24kg

48.3*3.25*3050mm

10.68kg

 

 

 

 

 

 

Diagonal brace

      

48.3*3.25*915mm

3.4kg

48.3*3.25*1150mm

4.04kg

48.3*3.25*1572mm

5.34kg

48.3*3.25*1829mm

6.13kg

48.3*3.25*2130mm

7.06kg

48.3*3.25*2438mm

8.01kg

48.3*3.25*3050mm

9.90kg

 

Steel Plank

 

210*45*1.2*1000/2000/3000/4000

250*50*1.2*1000/2000/3000/4000

 

 

 

Screw jack base

   

38*4.0*500mm

3.35kg

38*4.0*600mm

3.65kg

48*4.0*600mm

4.4kg

35*500mm

4.5kg

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:what's the meaning of scaffold?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.
Q:how long should i wait to change my scaffolding piercing?
I wouldn't suggest changing it for at least 6 weeks. You have to allow the skin to heal before touching, turning or changing the bar. If you do change it beforehand, you risk damaging the skin and cartilage surrounding the piercing. I know that I didn't change mine for about 8 weeks, and I haven't ever had a problem with it.
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
Hi I got it done a few months ago I love it! Its really not that sore at all just a slight nip and then bit warm afterwards lol! Only thing annoyed me was couldn't sleep on it for a while and that was always the side I slept on! I live in Belfast and you can get it done from about 16. I just went to a well known tattoo parlour and had no problems what so ever. Go for it looks great Good luck :D
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q:Please help me in building professional people (scaffolding)
Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range